Poll: How Will Macy’s Closing Their Downtown Location Affect Downtown St. Louis In The Long-Term?

Macy's in the Railway Exchange building
Macy’s is located on 3 floors of the Railway Exchange building

You likely heard the news last week about the Macy’s store downtown:

Retailer Macy’s will close its downtown St. Louis in the Railway Exchange Center later this summer.

A final closing sale will begin June 2 and last 10 weeks. (KSDK)

Immediately following the announcement people were upset, but clearly not enough to keep the store open. The poll this week asks: How will Macy’s closing their downtown location affect downtown St. Louis in the long-term? The provided answers are:

  • Very negatively
  • Negatively
  • Neutral
  • Positively
  • Very positively
  • Unsure/no answer

These answers will be presented in random order in the poll (right sidebar) so the order doesn’t influence the results. You the comments below to share your thoughts.

— Steve Patterson

 

Gateway Arch Inaugurated By VP Humphrey Forty-Five Years Ago Today

For  a few years now many people have been gearing up for the 50th anniversary of the last piece of the Arch being set into place, that will be on October 28, 2015. I wasn’t born yet so the topping of the Arch isn’t the big deal as it is to those alive at the time, watching it take shape. To many they only knew the Arch grounds as a parking lot.

mage from Jefferson National Expansion Memorial archives.
Demolition of nearly 40 city blocks began in 1939, for decades the area was just parking.
From the Jefferson National Expansion Memorial archives.

This parking lot is the subject of chapter three of a new book: The Gateway Arch: A Biography by Tracy Campbell. If you want a coffee table book on the Arch, this isn’t it. If you want an interesting biography of an iconic object, this is your book. This book will be released on the 28th.

The Gateway Arch was expected to open to the public by 1964, but in 1967 the public relations agency stopped forecasting the opening date. The arch’s visitor center opened on June 10, 1967 and the tram began operating on July 24.

The arch was dedicated by [VP] Humphrey on May 25, 1968. He declared that the arch was “a soaring curve in the sky that links the rich heritage of yesterday with the richer future of tomorrow” and brings a “new purpose” and a “new sense of urgency to wipe out every slum.” “Whatever is shoddy, whatever is ugly, whatever is waste, whatever is false, will be measured and condemned” in comparison to the Gateway Arch. About 250,000 people were expected to attend, but rain canceled the outdoor activities. The ceremony had to be transferred into the visitor center. After the dedication, Humphrey crouched beneath an exit as he waited for the rain to subside so he could walk to his vehicle. (Wikipedia)

Hopefully we’ll have dry weather on October 28, 2015.

— Steve Patterson

 

Accessing Food Truck Events

I love patronizing food trucks, street food is part of the reason I live downtown. Food trucks are often located at various downtown locations, right next to the sidewalk. Very convenient.

Foods trucks at Third Degree's recent open house
Foods trucks at Third Degree’s recent open house

Food truck events, on the other hand, aren’t so convenient for those of us who’re disabled. Walking across grass, which is often uneven, is not an easy task. For some, it’s impossible.

The able-bodied can easily line up in grass.
The able-bodied can easily line up in grass.

For a few years now cities coast to coast have wrestled with accessibility of popular food truck events, so no citizens are excluded from participation. In 2011 Napa, CA halted a friday night event until a more accessible location could be found (source).

I’m asking local organizers to consider everyone when planning a food truck event.

— Steve Patterson

 

MetroBus Guide For SLU Law Faculty, Staff, & Students

Very soon the Saint Louis University School of Law will move into a renovated building downtown, near the courts.

Last month (April 2013) the exterior of the new law school was basically complete, with new glass elements and a new top floor.
Last month (April 2013) the exterior of the new law school was basically complete, with new glass elements and a new top floor.
The same building in September 2012
The same building in September 2012

But this post isn’t about the alterations to the building, this post is meant to help faculty, staff & students understand how to use the MetroBus system.

The distance between the current law school on the main SLU campus and the new building is 2.3 miles via Lindell/Olive & Tucker. Driving time is 9 minutes end to end, but no parking is available at the ends, so walking time needs to be added.

Taking the #10 (Gravois Lindell) MetroBus is 16 minutes, per Google Maps, including walking time.  Time on the bus is 11 minutes plus 5 for walking, so taking the bus is competitive with driving in this example.

Those going from the main campus can catch the #10 in one of two places: on Lindell east of Spring or Lindell east of Grand. You’ll exit the bus on just after it turns on 14th St., next to the Ford Building.

Bus stop at 14th & Pine
Riders returning the SLU main campus can catch the #10 at this bus stop at 14th & Pine, the Ford Building at left is the stop for those going to the law school.

In the opposite direction you’ll walk two blocks west along Pine to the stop shown above. You can exit at Grand to Spring for the main campus.

Frequency is every 30 minutes, 40 minutes after 11pm. The #10 line is the bus I use most often, the 30 minute frequency isn’t a problem when you know the schedule. I personally don’t use the printed schedule, I just check the times on the Google Maps iPhone app (or online) as needed.

The bus route number is shown on the front left followed by the the final destination.
The bus route number is shown on the front left followed by the the final destination. This example is the #70 (Grand) MetroBus heading NB.
The route number & destination is also displayed on the curb side of the bus, just behind the door.
The route number & destination is also displayed on the curb side of the bus, just behind the door.

Here are some other things to remember:

  1. Make sure you look for your bus, if you are busy reading the bus driver may not realize you want to board and pass you.
  2. Transfers offer a good value. Say you board the bus at 10:30am and pay $3 ($2 fare + $1 transfer), you’ll get a transfer good until 1pm!
  3. Bus drivers can’t offer change, so having $1 bills is a good idea, a monthly pass is $72. Hopefully a new SLU administration will join the Metro campus programs like St. Louis Community College, Washington University, and University of Missouri-St. Louis (UMSL).
  4. Let others get off the bus before boarding, when you exit use the back door rather than the front door. This reduces delays.
  5. You’ll need to pull the cord to signal you want to stop at the next bus stop.
  6. Don’t be afraid to sit toward the back, the front seats must be given up for elderly & disabled passengers.
  7. Other MetroBus lines within 2 blocks of the law school include: 30, 41, 74, 94, 97, 99. Four blocks away at 14th & Market adds the 4 & 11.

Anyone else have any positive advice?

— Steve Patterson

 

Readers: Don’t Build South County Connector

A majority of readers favor Trailnet’s suggestions to focus on transit, biking, and walking efforts to reduce automobile congestion:

South Hanley ducks under railroad tracks.
South Hanley ducks under railroad tracks.

Q: How should St. Louis County reduce auto congestion between Hanley & Watson?

  1. Focus on transit, bicycling and walking solutions 60 [57.14%]
  2. Build proposed “South County Connector” partially-elevated roadway 25 [23.81%]
  3. Do nothing 16 [15.24%]
  4. Unsure/no opinion 4 [3.81%]

The pro-Trailnet crowd combined with the “do nothing” group total a whopping 72.38% that didn’t select the built it option.

A public meeting will be held Thursday May 30th.

The South County Connector Draft Environmental Impact Statement (EIS) will be available for public review and comment from Friday, May 3, 2013 to July 19, 2013. During the review period, the St. Louis County Department of Highways and Traffic will host a public hearing for the Draft EIS on Thursday, May 30, 2013 from 4:00 p.m. to 8:00 p.m. at the Shrewsbury City Center (located at 5200 Shrewsbury Avenue, Shrewsbury, Missouri 63119).

The public hearing is an opportunity for interested persons to give testimony concerning the Draft EIS, including potential social, economic, and environmental impacts of the proposed roadway alternatives. Representatives of the South County Connector Study Team will also be available to provide information and answer questions about the Draft EIS at an open house meeting held at the same time as the public hearing. No formal presentation will be made. Display boards and copies of the Draft EIS will be available for review at the open house meeting. (South County Connector)

If you are among those who don’t think this project should move forward please contact all of the following:

We’ve invested millions in transit, now is the time to double-down on transit to get a return on our existing infrastructure investment.

— Steve Patterson

 

 

Advertisement



[custom-facebook-feed]

Archives

Categories

Advertisement


Subscribe