Tucker Boulevard Replacement Project Nearing Completion
The last bit of the old Tucker Blvd road surface, from Cass to Washington Ave, is now rubble. The last of the former rail tunnel was filled in a couple of months ago, now all that needs to be replaced is the last of the small area that didn’t have a tunnel under the roadway.
In addition to the road surface, the adjacent sidewalk for these last couple of blocks. Auto traffic is now open from Cass to Washington Ave in both directions, though constrained on the south end.
— Steve Patterson