Home » Featured » Recent Articles:

This Blog Goes To Eleven

October 30, 2015 Featured, Site Info, Steve Patterson Comments Off on This Blog Goes To Eleven

Tomorrow is the eleventh anniversary of this blog, Sunday is the start of the 12th year. I can’t hear the word eleven without thinking of this clip from 1984 film This is Spinal Tap:

Hopefully my mind is sharper than Nigel’s. See you Sunday.

— Steve Patterson

 

 

North 14th Street Reopened To Traffic 5 Years Ago Today

Five years ago today people were able to do what they hadn’t in 33+ year — drive on two blocks of North 14th Street.

From 1977-2010 two blocks of N 14th was a "pedestrian mall". By Spring 1991 it was already long-dead.
From 1977-2010 two blocks of N 14th was a “pedestrian mall”. By Spring 1991 it was already long-dead.
After many years of trying to un-mall 14th, a ribbon cutting for the new street was held on July 29, 2010. But since new streetlights hadn't arrived, vehicular traffic wasn't allowed to drive down it.
After many years of trying to un-mall 14th, a ribbon cutting for the new street was held on July 29, 2010. But since new streetlights hadn’t arrived, vehicular traffic wasn’t allowed to drive down it.
The new streetscape is friendly to both pedestrians & motorists, need not be mutually exclusive
The new streetscape is friendly to both pedestrians & motorists, need not be mutually exclusive
This photo is from a May 1972 thesis, taken before 14th was malled. Source: "A rehabilitation of a small commercial district: 14th Street in Murphy-Blair" by Norman Robert Spatz
This photo is from a May 1972 thesis, taken before 14th was malled. Source: “A rehabilitation of a small commercial district: 14th Street in Murphy-Blair” by Norman Robert Spatz

b

b

b

b

 

Nearly Half of Readers Disappointed With The Amount of CityArchRiver Work Completed to Date, More 50th Anniversary Events Today

Fifty years ago today the final section of the Arch was lowered into place. Today’s date was a big deal to organizers of the CityArchRiver design competition and for a long time they said all the work to actually connect the Arch grounds to the city would be done. Many of us were highly skeptical of these claims, but I didn’t want to burst their civic bubble.

Luther Ely Smith Square is finished. He's the guy that helped get 40 city blocks of the original city razed.
Luther Ely Smith Square is finished. He’s the guy that helped get 40 city blocks of the original city razed. Click image to open his Wikipedia entry

Here are the results from the Sunday Poll:

Q: Please rate the amount of CityArchRiver work completed to date

  1. Somewhat dissatisfied 11 [36.67%]
  2. Somewhat satisfied 6 [20%]
  3. Neutral 4 [13.33%]
  4. Very satisfied 3 [10%]
  5. Very dissatisfied 3 [10%]
  6. Unsure/No Answer 3 [10%]

Depending upon my mood I’m either neutral or somewhat satisfied.

Impressive fireworks show Saturday night to conclude Arch 50 Fest
Impressive fireworks show Saturday night to conclude Arch 50 Fest

Of course, I had low expectations.

There are numerous events today:

Recognition Ceremony and Birthday Party – Wednesday, October 28, 11 am

At 11 am—the moment when the final piece of the Gateway Arch was put into place 50 years ago—National Park Service leadership, along with local officials and partner dignitaries, will lead a special recognition ceremony commemorating the completion of the Arch on the Fourth Street side of the Old Courthouse.

Free Cupcakes! 

From 11:30am – 1:30pm, Sarah’s Cake Stop & Destination Desserts cupcake trucks will distribute free 50th anniversary-themed cupcakes to the first 1,000 visitors. The trucks will be located on 4th street on the east side of the Old Courthouse (11 North 4th Street). 

$1 Journey to the Top Tram Rides – October 28, all day

For one day only, Journey to the Top tram ride tickets will be sold at the original price of $1. Tickets can be purchased in person at the Old Courthouse, online at http://ticketsforthearch.com or by calling 877-982-1410.

Visitors to the top will receive:

  • A “Top of the Arch” lapel button modeled after one that was originally distributed when the trams opened in 1967.
  • An “I Went to the Top” certificate, similar to the certificate handed out to riders in the 1960s.

Limited-edition 50th Anniversary Merchandise

Custom-designed 50th anniversary items—including hats, shirts, jackets, mugs, coasters, and more—are available for purchase in the Museum Store located under the Gateway Arch, the Old Courthouse Gift Shop, and online at www.shop.jnpa.com.

Partners and sponsors of these events include the National Park Service, Bi-State Development , Jefferson National Parks Association, City of St. Louis, and the Missouri History Museum.

 

— Steve Patterson

 

Curb Ramps Added Making Newstead & Duncan Crosswalk Passable

In May 2013 I posted about the lack of curb ramps for a crosswalk at Newstead & Duncan. Today I can say this has been corrected. The fix is minimal — the least required.

This February 2012 photo looking East across Newstead at Duncan shows a crosswalk that's clearly not ADA-compliant -- no curb ramps! Decorative brick was a higher priority.
This February 2012 photo looking East across Newstead at Duncan shows a crosswalk that’s clearly not ADA-compliant — no curb ramps! Decorative brick was a higher priority.
In March 2015 utility work was going on at this intersection.
In March 2015 utility work was going on at this intersection.
My next visit was October 9th, by then I noticed they did build curb ramps following the utility work.
My next visit was October 9th, by then I noticed they did build curb ramps following the utility work.

Not sure why the crosswalk is so wide, far wider than the ramps on each end. Duncan Ave is a long way from being pedestrian-friendly.

— Steve Patterson

b

b

b

 

Cleveland’s Healthline Bus Rapid Transit (BRT), Part 1

October 26, 2015 Featured, Planning & Design, Public Transit, Transportation, Travel Comments Off on Cleveland’s Healthline Bus Rapid Transit (BRT), Part 1

I’m back from my brief Bus Rapid Transit (BRT) research trip in Cleveland. I’m still processing the experience so today I want to introduce their transit system, the Healthline BRT in particular.

BRT is an innovative, high capacity, lower cost public transit solution that can significantly improve urban mobility. This permanent, integrated system uses buses or specialized vehicles on roadways or dedicated lanes to quickly and efficiently transport passengers to their destinations, while offering the flexibility to meet transit demand. BRT systems can easily be customized to community needs and incorporate state-of-the-art, low-cost technologies that result in more passengers and less congestion. (National BRT Institute)

In short, BRT is an alternative to light rail/streetcar systems.

The HealthLine route travels 6.8 miles (11 km) along Euclid Avenue from Public Square in Downtown Cleveland to Louis Stokes Station at Windermere in East Cleveland. It passes through the neighborhoods of Downtown, Midtown, Fairfax, University Circle and the suburb of East Cleveland.

Between Public Square and East 105th Street, Euclid Avenue has two “bus only” lanes close to the inner median which only allow HealthLine vehicles passage, reducing delays due to conflicts with general traffic during busy times. Complementing the HealthLine is a set of bike lanes on the outer edges of the stretch Euclid Avenue that connects Cleveland State University with Case Western Reserve University. (Wikipedia)

It should be noted they don’t have a newer light rail system like our MetroLink, their rail lines all date from the early to mid-20th century. Two 1913 suburban streetcar lines are now considered light rail, Blue & Green. Their main rail line, Red, is a heavy rail line. Planned before 1930, it didn’t open until 1955. The last extension, to their airport, was in 1968. Red, Blue, & Green share some track & stations. All three stop at Tower City-Public Square, an underground station connected to the 1930 Terminal Tower.

Built for $179 million by the Van Sweringen brothers, the tower was to serve as an office building atop the city’s new rail station, the Cleveland Union Terminal. Originally planned to be 14 stories, the structure was expanded to 52 floors with a height of 708 feet (216 m). It rests on 280-foot (85 m) caissons. Designed by the firm of Graham, Anderson, Probst & White, the tower was modeled after the Beaux-Arts New York Municipal Building by McKim, Mead, and White. The Terminal Tower opened for tenants in 1928, though the Union Terminal complex wasn’t dedicated until 1930.

It remained the tallest building in the world outside of New York City until the completion of the main building of Moscow State University in Moscow in 1953; it was the tallest building in North America outside of New York until the Prudential Center in Boston, Massachusetts, was completed in 1964. (Wikipedia)

Let’s state a look.

The platform at Tower City-Public Square. Their interurban streetcar lines converged at this downtown location.
The platform at Tower City-Public Square. Their interurban streetcar lines converged at this downtown location.
Looking from the mall inside Tower City down to the transit level.
Looking from the mall inside Tower City down to the transit level.
The grand lobby of Tower Terminal leading out to Public Square
The grand lobby of Tower Terminal leading out to Public Square
Public Square is being rebuilt in time for the 2016 GOP convention, Tower Terminal is in the background.
Public Square is being rebuilt in time for the 2016 GOP convention, Tower Terminal is in the background.

During construction the cross streets, Ontario & Superior, are blocked off:

Public Square is the four-block central plaza of downtown Cleveland, Ohio. Based on an 18th-century New England model, it was part of the original 1796 town plat overseen by Moses Cleaveland, and remains today as an integral part of the city’s center. The 10-acre (4.0 ha) square is centered on the intersection of Superior Avenue and Ontario Street. Cleveland’s three tallest buildings, Key Tower, 200 Public Square and the Terminal Tower, face the square. Other Public Square landmarks include the 1855 Old Stone Church and the former Higbee’s department store made famous in the 1983 film A Christmas Story. It reopened as the Horseshoe Casino Cleveland on May 14, 2012.

A 125-foot monument to Civil War soldiers and sailors occupies the southeast quadrant of the square. City founder Moses Cleaveland and reformist mayor Tom L. Johnson each have statues on the square. (Wikipedia)

It appears Ontario will remain closed, with Superior reopening in 2016 — the four distinctive blocks will become two rectilinear blocks visually connected on other side of Superior. For more information click here.

Why have I spent so much time leading up to Public Square? Because prominent corridor, Euclid Avenue, traveling from Public Square out to the adjacent suburb of East Cleveland. Euclid Ave is Cleveland’s Main Street.

St. Louis has no equivalent. Broadway travels North & South from our downtown out into the suburbs, but it doesn’t have major institutions. Extending West from downtown Olive/Lindell has many institutions and population density, but it doesn’t even reach the city limits.

For decades Cleveland’s Euclid corridor was served by bus, the No. 6.  Like our #70 MetroBus route on Grand, their No. 6  was heavily used. Like our long-diuscuyssed North-South MetroLink, their original plan was for street-running light rail.

RTA originally conceived the project in the 1980s as the “Dual Hub” light-rail line, but found in the 1990s that a rail line would have cost $700 million to $800 million. Inspired by the rapid bus system in Curitiba, Brazil, RTA redesigned the Euclid Avenue project to achieve the speed and high-class feel of light rail at the lower cost of a bus line. (Euclid Corridor Health Line is a strong RX for Cleveland’s once and future Main Street)

From the same November 2008 article:

Critics complained about the two years of surgery on the avenue, which disrupted traffic and killed some small businesses. The work, however, was absolutely necessary; it replaced water and sewer lines that dated as far back as the turn of the 20th century. 

Critics also called the Health Line a boondoggle, saying it will do little more than provide a marginal improvement over the former No. 6 bus line, which was already the city’s most successful and heavily used route. The new line will cover the distance between downtown and University Circle in 20 minutes, 10 minutes less than the old line. 

It’s true that when measured purely in cost efficiency per rider, the project didn’t score high on tests required by the Federal Transit Administration as a condition for funding. But the project did meet those basic requirements.  (Euclid Corridor Health Line is a strong RX for Cleveland’s once and future Main Street)

A year later, during the worst of the recession, there were positive signs:

Despite the challenging financial climate, the $197 million renovation of Euclid Avenue has become an economic development engine for the city. More than $3.3 billion worth of projects are in the works or recently finished along five miles of the vital artery. 

To be sure, the progress has been slower than many would like. The number of projects would be far greater if not for an economic crisis that has stalled or killed developments across the country. And given a shortage of private lending, many of the high-profile projects along the corridor depend on institutions, tax credits and other incentives.

Nevertheless, builders are staring down the shaky real estate market and finishing town houses in University Circle. They’re completing apartments in former department stores downtown. And they’re pitching plans to make Midtown a biomedical and technology hub. (Cleveland’s Euclid corridor project has paved the way to economic development)

Going from the Megabus stop to our hotel we first spotted the Healthline, at E. 21st & Euclid Ave.

The Heathline is traveling Eastbound in its bus-only lane. The Cleveland State University Student Center in the background was built after the BRT line opened.
The Heathline is traveling Eastbound in its bus-only lane. The Cleveland State University Student Center in the background was built after the BRT line opened.

As I rode the Healthline I kept thinking much of the new development on hospital & university campuses would’ve happened anyway, but a good point was made in the 2009 article quoted above:

Without the corridor project, the university’s new buildings probably would have turned their backs to Euclid Avenue, creating a more insular campus. But the remade road has encouraged CSU to put its front doors on Euclid, to build on both sides of the street and to consider how the appearance of new university buildings fits with the avenue. (Cleveland’s Euclid corridor project has paved the way to economic development)

And therein lies a difference the BRT made versus a standard bus line — new buildings were built oriented toward the public street rather than internally.

Next week, in Part 2, we’ll take a closer look at specifics of the Healthline, list pros & cons, and discuss lessons for St. Louis.

— Steve Patterson

 

 

 

Advertisement



[custom-facebook-feed]

Archives

Categories

Advertisement


Subscribe