Home » Featured » Recent Articles:

Poll: Where Do You Live?

Please vote in the poll, located in the right sidebar
Please vote in the poll, located in the right sidebar

The poll this week is very straightforward, I simply want to know where you reside.  Here is the list of options:

  • St. Louis (North)
  • St. Louis (Central Corridor)
  • St. Louis (South)
  • St. Louis County (North)
  • St. Louis County (Central/West)
  • St. Louis County (South)
  • St. Clair County, IL
  • Madison County, IL
  • St. Charles County, MO
  • Jefferson County, MO
  • Illinois (not St. Clair or Madison counties)
  • Missouri (not St. Louis city; St. Louis, St. Charles, or Jefferson counties)
  • US Midwest, except Missouri & Illinois
  • US Northeast
  • US Southeast
  • US Southwest
  • US West/Northwest
  • North America, NOT the United States
  • Elsewhere in the world

The poll is in the right sidebar, mobile users need to select the desktop layout from the bottom of the mobile screen (sorry, doesn’t show within Facebook).  I look forward to seeing the results.

— Steve Patterson

 

Eads Bridge 140th Anniversary

July 4, 2014 Downtown, Featured, History/Preservation, Transportation Comments Off on Eads Bridge 140th Anniversary

One hundred forty years ago the Eads Bridge opened after seven years of construction:

The structure was dedicated 4 July, 1874. It had a double deck structure. The upper deck extended over the entire width with a vehicular roadway and two pedestrian walkways. In 1947, this deck was replaced with concrete filled “I Beam Lok” and the roadway was widened to 41 feet. The original highway deck had consisted of treated gum flooring and wood stringers supported on steel floor beams. There were two “street car” tracks at floor level. The trolleys stopped running on the bridge in 1935, and the track work was removed in 1942. (St. Louis History — recommended!)

Wow, wood flooring!

2011
Looking east, May 2011
Eads Bridge with the Admiral in early 1991
Eads Bridge with the Admiral in early 1991

Hopefully civic leaders will come up with a great way to celebrate the Eads Bridge on its 150th a decade from now. Happy Birthday America & Eads Bridge!!

— Steve Patterson

 

Getting To Fair St. Louis In Forest Park

Fair Saint Louis begins today in Forest Park. The event is usually held on the Arch grounds but will be relocated to Forest Park this year and next year due to City+Arch+River construction.

For weeks now we’ve been hearing complaints about having to pay $30/car to park in Forest Park. I’m glad such a premium is placed on parking, this has hopefully forced people to consider transit, carpooling, etc.

Layout of the fairgrounds within Forest Park
Layout of the fairgrounds within Forest Park

For those who have mobility issues, there is is a substantial walk just to reach a gate. If you’re taking a friend or family member that has difficulty walking distances please consider taking their manual wheelchair along, no wheelchairs will be available in the park. The best view of the stage will be from the top of Art Hill, which is accessible using the trail & sidewalk network.

Links:

We’re taking MetroLink to Forest Park tonight to see the fireworks, are you going to Fair Saint Louis?

— Steve Patterson

 

Fare Increase Starts Today

MetroLink at the Stadium Station
MetroLink at the Stadium Station

Metro’s new fares begin today:

The option most favored by the public was Option 2 which will raise the prices of the MetroLink one-ride fare, as well as the weekly, monthly, and university semester passes. The cost of the one-ride MetroLink fare will increase from $2.25 to $2.50. Weekly passes will increase from $25 to $27; monthly passes from $72 to $78; and the semester pass will go from $150 to $175.

The fare increase will not impact the $2 base MetroBus fare and the 2-Hour Pass/Transfer will remain at $3.00. The cost of the $7.50 Day Pass will not change nor will the current $4.00 Metro Call-A-Ride fare. (Metro)

The 2-hour pass is the same as a transfer, used on MetroBus or MetroLink light rail. This $3 pass/transfer allows riders who want to ride any combination of bus or rail, in any direction, within a 2-hour window, to do so for little more than the base fare. Those who don’t need more than a single ride in two hours can pay the one ride fare ($2 bus, $2.50 light rail).  I can imagine some weekly/monthly pass holders going to one ride or 2-hour passes, they’ll need to do the math to determine the most cost effective way for them to use Metro. I don’t use the system enough to justify a monthly pass.

One system similar in size to Metro is Greater Cleveland Regional Transit Authority (RTA). Their fares start at $2.25 for “Bus/Rapid/BRT” and are $2.50 for their “Park-N-Ride Bus.”   For transfers I looked at their FAQ:

Transfer Privileges are included in all RTA fare media: the All-Day Pass, 7-Day Flex Pass or Monthly Pass, and 5-trip farecards. RTA riders paying cash no longer receive transfers and should consider purchasing farecards or passes.

Interesting, if you buy 5 tickets in advance they each cost the same as one but include a transfer. I looked at 6-8 other systems and each has a unique way of handling the question of transfers. Some make everyone pay for a transfer but market it as being “free.” I like the option of just paying the base fare for most trips, upgrading to a 2-hour pass/transfer when I need to.

— Steve Patterson

 

Fifth Anniversary of Citygarden, Five Biggest Flaws

June 30, 2014 Downtown, Featured, Parks 8 Comments

Five years ago today Citygarden was officially opened to the public.  I want to talk about five big design flaws, but first some background and a few of the many positives.

The two blocks of Citygarden were cleared in the early 90s for "passive space." Photo date: May 12, 2006
The two blocks of Citygarden were cleared of some historic buildings in the early 90s to create “passive space.” They were too passive! Photo date: May 12, 2006
Both blocks were fenced off for more than a year as workers built Citygarden.  Photo date May 17, 2008.
Both blocks were fenced off for more than a year as workers built Citygarden. Photo date May 17, 2008.
Mayor Slay at the opening on June 30, 2009. Instead of cutting a ribbon Slay called the mechanical room to have the splash fountains turned on.
Mayor Slay at the opening on June 30, 2009. Instead of cutting a ribbon Slay called the mechanical room to have the splash fountains turned on.
Splash fountains at night, October 2011
Splash fountains at night, October 2011
Lighting is part of what makes Citygarden so special, September 2011
Lighting is part of what makes Citygarden so special, September 2011
A friend's grandsons love ringing the bells. This photo is from June 2011, they're much bigger now and they have a younger sister.
A friend’s grandsons love ringing the bells. This photo is from June 2011, they’re much bigger now and they have a younger sister.

I’ve spent a lot of time in Citygarden in the last five years, observing the good & bad.   Here are the five biggest flaws at Citygarden:

  1. Didn’t plan for continuation of Gateway Mall “Hallway” to the east & west
  2. Lack of curb bulbs on perimeter streets (8th, Market, 10th, Chestnut) — see map
  3. Keeping 9th Street closed
  4. No public restroom
  5. Restaurant space

Let’s take a look at each:

1) Didn’t plan for continuation of Gateway Mall “Hallway” to the east & west

One the best things about the Gateway Mall Master Plan was the idea of a wide “hallway” running the length of the mall, Citygarden got things going with the first two blocks. Had they built the east & west ends of these two blocks, at 8th & 10th, with continuation we might have be wen able to add another block or two to the Hallway by now. In the center, at 9th, they built the prototype for how the hallway would cross streets.

The line of sight matches the path you take on the hallway, imagine this from Broadway to 20th.
The line of sight matches the path you take on the hallway, imagine this from Broadway to 20th.
At 8th Street the hallway comes to an terminus.
At 8th Street the hallway comes to an terminus, to continue east the Citygarden end will need to be busted out and rebuilt how it should’ve been done originally. The fire hydrant will also need to be moved, a rather simple task when the project was being built from scratch in 2008-09.
The same problem exists at the  10th Street end of the 2-block hallway, the finished side will need to be busted out and rebuilt correctly to continue west of 10th Street.
The same problem exists at the 10th Street end of the 2-block hallway, the finished side will need to be busted out and rebuilt correctly to continue west of 10th Street.

Had the ends at 8th & 10th been designed to match how the hallway crosses 9th Street it would be so much easier (cheaper) to continue. Either continuation wasn’t considered or the decision was made to not make it easy. The previous version of these two blocks (1994-2008) had a similar scheme of a wide walkway through an allée of trees with the hope of it extending. Never happened in its 14 years.

2) Lack of curb bulbs on perimeter streets (8th, Market, 10th, Chestnut)

At the south and north ends of 9th, Market & Chestnut, respectively, 9th was narrowed by “bulbing” the curb out to cap the parking lane, reducing the crossing distance. This is also mentioned in the Master Plan. Sadly, it was only done on 9th.

Looking east from 9th a rain garden/ bulb to cap the parking lane would've helped shorten the walk across Market
Looking east from 9th a rain garden/ bulb to cap the parking lane would’ve helped shorten the walk across Market

Had they done it at 10th and 8th too they could’ve extended the hallway mentioned above. This also would’ve helped crossing the too-wide Market Street and Chestnut. The master plan called for a 20-direction bike lane along the north side of Market, but the planners could never describe how that would work with signals, entry/exit, etc.

3) Keeping 9th Street closed

Initially 9th Street was supposed to be reopened the vehicles once Citygarden was completed, 9th is one-way northbound. But some wanted to closed permanently.

Colorful barricades close off 9th Street to vehicles, the old fire ice cream truck is allowed in to vend
Colorful barricades close off 9th Street to vehicles, the old fire ice cream truck is allowed in to vend

Initially they’d move the barricades late at night to allow traffic through, not sure if they still do that. One-way couplets only work if streets remain open in opposite directions, 8th & 10th are both one-way southbound. Except that now, because of Ballpark Village, 8th is two-way south of Market.  We have a poorly functioning downtown grid of one-way & two-way streets, each with  random blocks closed to traffic. Maddening.

I think part of the reason they wanted 9th kept closed is they quickly realized nobody had considered pedestrian signals at the hallway crossing 9th (nor at Chestnut). Oops. Once again pedestrians weren’t given proper consideration.

4) No public restroom

The Gateway Foundation spent tens of millions of dollars building Citygarden, and for the most part it is a world-class facility.

Half the year twi port potties are on the 10th street sidewalk on the west end of Citygarden -- classy!
Half the year twi port potties are on the 10th street sidewalk on the west end of Citygarden — classy!

Really? All that money but no place to use the bathroom? The simplest fix now is to extend the hallway one block west to incorporate the Twain block, adding a modern restroom structure off of the hallway in that block. I suggested as much in 2010.

5) Restaurant space

The third restaurant opened recently in the restaurant space in the northeast corner (8th & Chestnut. Architecturally the building is a looker, the main reasons the first two places failed were poor service (The Terrace View) and food & service (Joe’s Chili Bowl). I ate at both more than once, because of the ambiance.  I met a friend for lunch at Death in the Afternoon on Friday, I was impressed with both the food & service. Others seemed to be impressed too as the place quickly filled for lunch.

Interior of the restaurant on Friday
Interior of the restaurant on Friday
Outside tables were also busy
Outside tables were also busy

The previous problems were service (2) and food (1), so why is the building a flaw? The problems are on the Chestnut side.

This cool-looking overhang onto the Chestnut sidewalk can't be ADA-compliant, a visually impaired person could walk right into the building.
This cool-looking overhang onto the Chestnut sidewalk can’t be ADA-compliant, a visually impaired person could walk right into the building.
The facade to the public street (Chestnut) isn't welcoming. I know, it's designed to face the garden. They could've grown vines over this side or done something to soften it. Mount menu boards so passersby could read the menu to see if they wanted to go around to the front.
The facade to the public street (Chestnut) isn’t welcoming. I know, it’s designed to face the garden. They could’ve grown vines over this side or done something to soften it. Mount menu boards so passersby could read the menu to see if they wanted to go around to the front.
The previous modern sink in the unisex bathroom I used has been replaced by a traditional-looking non-ADA compliant pedestal.
The previous modern sink in the unisex bathroom I used has been replaced by a traditional-looking non-ADA compliant pedestal.

These five flaws need to be addressed. A 6th, a poorly-built ADA ramp at 10th & Chestnut, got replaced a couple of years ago after I finally made a formal complaint with the city. The City of St. Louis owns the land but the Gateway Foundation funded, designed, built and manages Citygarden.

— Steve Patterson

 

Advertisement



[custom-facebook-feed]

Archives

Categories

Advertisement


Subscribe