Home » Midtown » Recent Articles:

Metro’s Disconnect With Riders, Pedestrians

On Monday August 20, 2012 the Grand MetroBus stop and Grand MetroLink stations reopened. On the overhead speakers in all stations Metro, speaking in transit jargon, announced the Grand station was open for “revenue service.” Really Metro, revenue service?

From dictionary.com:

jar·gon [jahr-guhn, -gon] noun

1. the language, especially the vocabulary, peculiar to a particular trade, profession, or group: medical jargon.

2. unintelligible or meaningless talk or writing; gibberish.

3. any talk or writing that one does not understand.

4. pidgin.

5. language that is characterized by uncommon or pretentious vocabulary and convoluted syntax and is often vague in meaning.

What’s the big deal, so they used transit agency speak? The use of technical jargon by any business shows it doesn’t know how to communicate with its customers. If they announcement had been that Grand was “open for service” nobody would’ve  thought they didn’t have to pay since they didn’t say “revenue” before service. Metro has problems relating to those of us that use transit, largely because Metro employes drive instead of use transit.

From the joint City/Metro press release:

On Saturday the ribbon cutting was held for the Grand viaduct (bridge). 

WHERE: South end (Chouteau side) of Grand Bridge.

(VIP and media parking will be available off Papin Street.)

The public is encouraged to take the #70 Grand MetroBus or MetroLink to the Grand Station. Parking at the new Grand MetroLink Station Park-Ride lot is also an option. The lot is located at Scott Avenue and Theresa Avenue at the northeast end of the bridge.

At least they mentioned transit after parking. I took transit to the event, but not the #70 MetroBus or MetroLink. I caught the #32 just two blocks east of my loft downtown and it dropped my off right at Grand & Chouteau, much closer than the MetroLink or rerouted #70.

ABOVE: The westbound #32 MetroBus on Chouteau just barely west of Grand. The Pevely bldg is to the left, for now.

But the real problem is how Metro didn’t connect their new work to the city. I’ve already shared this concern with folks from Metro, some who were in agreement with me and others with the attitude that created the disconnect. Let me show you what I’m talking about.

ABOVE: Metro built a small parking lot for the Grand station which included a new sidewalk for the south side of Scott Ave. The other side of Scott Ave doesn’t have a sidewalk at all.
ABOVE: But Metro assumed the only folks that would walk on this sidewalk are going to their car in their parking lot. They changed the grade and didn’t bother to connect the sidewalk so that people, like myself, can cross Scott or Theresa Avenues. One Metro employee said it’s just an employee entrance at the business across the street. WTF!?! If they use transit they’ll be a pedestrian!
ABOVE: The little bit of sidewalk along Theresa next to Metro’s new parking lot is useless anyway. Why wasn’t it removed?

What is there to connect to east of here? Lots actually, including a Metro facility. I doubt those who designed the station, parking lot and sidewalk ever bothered to walk around the area before starting the design. Designers must literally put themselves in the shoes of those that’ll use what they design.

ABOVE: Businesses exist directly east of the station, Metro could’ve helped provide a place for pedestrians rather than force them into the street or walk on grass.
ABOVE: Some buildings are vacant but being so close to a major transit hub should be helpful in getting them occupied.
ABOVE: And 4/10th of a mile east is a Metro facility.

I continued on Spruce to Compton. This would be a good route for people going to the Chaifetz Arena, Harris-Stowe and Sigma-Aldrich.

I took lots of pictures and some video at the Grand viaduct/bridge ribbon cutting but I’m not going to show you those. The speakers  all talked about how great it’ll be for pedestrians. True, it’s a massive improvement as I acknowledged here. I’m just furious the most basic/obvious pedestrian connection wasn’t planned for yet again.

To Metro engineers/planners/designers: Transit users are pedestrians when arriving & leaving transit stations. We come from and go in all directions. Able bodied pedestrians take the shortest route — a straight line. This isn’t complicated stuff.

— Steve Patterson

 

Excellent Use For Street-Level Space: Studios For Local Artists

August 3, 2012 Downtown, Featured, Midtown 1 Comment

When the Leather Trades Artist Lofts opened last year few were happier than those that live across the street. For years the building at 1600 Locust was dark and without activity, save for the few times someone would break in.

ABOVE: Leather Trades Artists Lofts before opening in 2011

On Sunday I finally visited the the artist studios as part of the City-Wide Open Studios tour organized by the Contemporary Art Museum.

ABOVE: A studio space accessed through the parking garage.
ABOVE: View of the YMCA across 16th Street
ABOVE: Front studio space facing Locust St.

I’m so glad the high-end condo project failed a few years ago, the building has more residents as a result of the for-rent apartments. The street-level windows are interesting rather than be vacant with “for lease” signs. The same developer is nearing completion on the Metropolitan Artist Lofts in Midtown at Grand and Olive.

Ground floor “retail” doesn’t always have to have a retail store to make a positive contribution to the pedestrian experience on the sidewalk.

— Steve Patterson

 

Code Compliance Isn’t The Same As Best Practices

Last week on Tuesday July 17th the 197-unit apartment building at 3949 Lindell was destroyed by fire.

The Lindell Apartments at 3949 Lindell caught fire around 7 p.m. and quickly went to five-alarms.

Around 100 people were inside the building at the time. Everyone was evacuated safely. The 197 unit building housed around 250 people who are now homeless. (KSDK)

Less than an hour after firefighters arrived on the scene of a blaze at a Central West End apartment building Tuesday night, they were forced to evacuate as the top floor of the four-story structure began to collapse.

The flames spread so fast through the attic that firefighters thought something must be wrong with the building. (stltoday.com — see photo gallery)

The building was previously destroyed by arson in June 2007 during construction, but this time it was occupied.

ABOVE: The 3949 Lindell Apartments earlier this year.

Had a fire started in a kitchen, for example, the sprinkler system would have likely put it out.  But the fire is said to have started in an attic space though, above the units and the sprinkler system.  Apparently the building code allows the use of a drywall wall to be used as a firestop within the attic to slow the spread of the fire. But a wood framed wall with drywall can’t hold a fire for long. Between apartments it’s good enough to contain a fire until the sprinklers come on. But in an open attic space with so much wood a big fire can get going and pretty much blast through a drywall firestop.

ABOVE: The massive roof has no masonry walls to divide it. Image from Google Maps, click to view.

So while the building may well have been code-compliant, it wasn’t built with best practices. Such a large building, especially one of wood frame construction, should have had masonry walls to completely section off the building into parts.  A fire may have destroyed or heavily damaged a section of the building but the rest would have been unharmed. Such a wall exists between the parking garage and the building, likely required to keep a car fire from spreading from the garage to the building.

I’ve been photographing this building for years, but I never once visited inside. Here are images from 2007 & 2008:

ABOVE: The building was well underway on June 3, 2007
ABOVE: All wood framing was destroyed by arson on June 13, 2007
ABOVE: The front facade is taking shape again on August 1, 2008
ABOVE: The west end of the front facade not yet covered in brick on August 1, 2008. The old McDonald’s was being razed.

It’s important to note the property owner was not the original developer, from January 6, 2012:

Education Realty Trust, a Memphis-based developer, owner and manager of college housing, has purchased an apartment complex near Saint Louis University for nearly $28.5 million.

The four-story complex at 3949 Lindell Blvd. was bought with cash on hand, the company said. Education Realty Trust recently began doing business as EdR as part of a rebranding effort.

City of St. Louis records show the apartment building’s former owner as GB St. Louis 1 Temp LLC, a Dallas-based affiliate of Frank Howard’s Gulfstream Capital Partners. (St. Louis Business Journal)

The following images are from Thursday July 19, 2012:

ABOVE: Scene on July 19, 2012 passing by on the #10 MetroBus
ABOVE: West side as seen from the Arby’s parking lot
ABOVE: The American Red Cross on the adjacent shopping center parking lot
ABOVE: Residents being allowed back inside a north entrance off McPherson
ABOVE: Looking east along McPherson Ave, this side has no visible damage
ABOVE: Evidence of floor collapses can be seen on the east side near the garage
ABOVE: A sidewalk tribute for pets that died. The listing on forrent.com indicates pets weren’t allowed. Click image for listing.
ABOVE: The building is just west of the endangered AAA building
ABOVE: Lindell facade gives the impression just the roof was burned, but structural damage is clear in numerous areas.
ABOVE: Wall buckling above 2nd floor windows toward the west end of the Lindell facade

The existing frame construction will be razed with only the parking garage remaining. When apartments are built here again it needs to have several masonry firestops from the ground to above the roof. Ideally AAA and CVS will get together with EdR to include the west half of the AAA site into the new construction as well as a CVS pharmacy and renovation of the AAA for a restaurant space.

No doubt that wired smoke alarms helped in alerting all the residents so no human life was loft. But understand that building codes are the very minimum that must be met to obtain an occupancy permit.

— Steve Patterson

 

St. Louis’ Beer Garden History Goes Back 189 Years, Continues Today

July 10, 2012 Featured, Midtown 4 Comments

It’s still warm out but nothing like the heat we had in the last week. In the hot summer weather the last thing I want to think about doing is leaving my air conditioned loft and drink beer outside. But in the early 19th century modern air conditioning didn’t exist. In 1823 shade, a breeze, and a cold brew were the best ways to beat the heat:

June 10, 1823: St. Louisans avoided the heat by visiting the city’s first beer garden, the Vauxhall Garden on Fourth between Plum and Poplar. St. Louis is credited with being the first city in America to develop outdoor restaurants and theaters. But it wasn’t until 1854 that the beer garden came into it’s own, when Franz Joseph Uhrig built a garden restaurant and theater in a wooded tract containing a cave for the natural cooling of beer. 

The garden, known as Uhrig’s Cave, was at Washington and Jefferson avenues, a site later occupied by the Coliseum and still later by Jefferson Bank. First-run entertainment for all ages was provided, with some of the earliest American performances of Gilbert and Sullivan operettas and more serious dramatic pieces. Schnaider’s Garden was another  popular spot, providing opera and the music of a grand promenade orchestra. Kuhn’s Brewery, the Lemp Brewery, Cherokee Cave, and Winkelmeyer’s were similar, and all gave the city a pleasant air during the hot summer months.  (From the book St. Louis Day by Day by Francis Hurd Stadler)

See my posts on the Coliseum here and Jefferson Bank here.  For more info on Vauxhall Garden click here. These old beer gardens may be gone but the tradition continues today.

ABOVE: Urban Chestnut Brewery’s new beer garden in Midtown Alley

What was once a parking lot is now a beer garden. Urban Chestnut leased the parking lot next door to their brewery at 3229 Washington Ave. Rather than use the parking lot to provide places for free customer parking the asphalt was ripped up and the beer garden was created. The owner of the former parking lot and building to the east, a high tech firm, will create parking for their employees on the vacant lot across the alley to the north.

ABOVE: View looking east in 2011 with the entrance to the parking lot on the left
ABOVE: Same view now
ABOVE: The beer garden at early evening

I’d like to see more parking lots ripped up and put to better use than in storing cars. Our streets are wide, use the space for on-street parking rather than the land between our buildings. More spaces like Urban Chestnut and we can connect downtown to midtown without interruption.

— Steve Patterson

 

 

 

Excellent Urban Infill: North Sarah Apartments By McCormack Baron Salazar

It was by chance that I discovered the North Sarah Apartments under construction on May 11, 2012.   Photographing the Hodiamont ROW for a post last month (link) I saw new construction a block north and had to check it out.

ABOVE: Storefronts face Sarah at the new North Sarah Apartments development, click image for aerial in Google Maps

Developer McCormack Baron Salazar describes the project:

North Sarah, a multi-family, mixed-use development, consists of 120 mixed-income rental units in garden apartments, townhouses, three mixed-use buildings (approx. 7,000 SF of commercial/retail space) and a fourth mixed-use building that includes management/community space (approx. 4,900 SF). This development represents a critical component of the North Central Redevelopment Plan that was developed over several years and completed in 2000 by the City of St. Louis, community stakeholders and residents.

Located in the North Central area of North St. Louis City, North Sarah is anchored by key St. Louis neighborhood assets on its edges, including Grand Center to the east, the Central West End to the west, and nearby Saint Louis University to the south and east. In the community’s core, a number of new civic, educational, commercial and residential developments have created nodes of reinvestment. However, despite this progress and potential, a number of blocks in the North Central district, including those targeted for the North Sarah development, remain heavily disinvested, preventing the neighborhood fabric from being “knit” back together as desired under the North Central Plan. The North Sarah development is a key connector in bridging current gaps in revitalization and catalyzing further reinvestment in the area.

The architecture of North Sarah celebrates the historic character of the community while featuring modern amenities and sustainable (“green” technology) to improve both the marketability and energy efficiency of the units. Specifically, the development is designed in accordance with Enterprise Green Communities criteria.

North Sarah also benefits from a creatively structured and capitalized Human Capital Planning and Implementation Program lead by Urban Strategies in collaboration with key community stake holders. The development will staff a community liaison that will assist with the coordination of supportive services and implementation of resident activities. (McCormack Baron Salazar)

Here are some of the pictures I took that day:

ABOVE: Streets have been narrowed at intersections, ramps are directly in the path of travel
ABOVE: Storefront spaces facing North Sarah, hopefully entrepreneurs can open shops and serve the needs of local residents
ABOVE: The buildings along North Sarah vary, you don’t see block after block of the same thing
ABOVE: The side streets (W. Belle Ave, C D Banks Ave, Finney Ave) have a nice feel to them
ABOVE: The buildings, facades and materials help give the appearance of private buildings rather than being part of the same apartment development
ABOVE: The spacing between buildings is good relative to the width of the buildings

The development isn’t perfect, someone thought it’d be a good idea to use the impervious concrete on some of the sidewalks on North Sarah even though it’s a rough surface. Time will tell how the project does but from a design perspective this is one of the best infill projects I’ve seen in the city. The inclusion of storefronts along North Sarah sets this apart from so many others that force residents to leave their neighborhood for goods & services.

Kudos to McCormack Baron Salazar and everyone involved for making this a reality!

– Steve Patterson

 

Advertisement



[custom-facebook-feed]

Archives

Categories

Advertisement


Subscribe