Four St. Louis High-Rise Public Housing Projects Replaced With Low-Rise Developments

September 30, 2020 Featured, History/Preservation, Neighborhoods, Planning & Design Comments Off on Four St. Louis High-Rise Public Housing Projects Replaced With Low-Rise Developments

Today’s post is about HOPE VI projects. You may have heard that term before, but if you’re unfamiliar here’s an introduction:

HOPE VI is a program of the United States Department of Housing and Urban Development. It is intended to revitalize the worst public housing projects in the United States into mixed-income developments. Its philosophy is largely based on New Urbanism and the concept of defensible space.

The program began in 1992, with formal recognition by law in 1998. As of 2005, the program had distributed $5.8 billion through 446 federal block grants to cities for the developments, with the highest individual grant being $67.7 million, awarded to Arverne/Edgemere Houses in New York City.

HOPE VI has included a variety of grant programs including: Revitalization, Demolition, Main Street, and Planning grant programs. As of June 1, 2010 there have been 254 HOPE VI Revitalization grants awarded to 132 housing authorities since 1993 – totaling more than $6.1 billion. (Wikipedia)

The short answer is HOPE VI was the program used to raze & replace distressed high-rise public housing with low-rise mixed-income private housing. With the notable exception of Pruitt-Igoe, all of St. Louis’ high-rise public housing was replaced with low-rise housing — three using the HOPE VI program. Pruitt-Igoe was famously imploded two decades before the start of the HOPE VI program.

From a May 2004 research report after a decade of HOPE VI:

Launched in 1992, the $5 billion HOPE VI program represents a dramatic turnaround in public housing policy and one of the most ambitious urban redevelopment efforts in the nation’s history. It replaces severely distressed public housing projects, occupied exclusively by poor families, with redesigned mixed-income housing and provides housing vouchers to enable some of the original residents to rent apartments in the private market. And it has helped transform the Department of Housing and Urban Development’s (HUD) approach to housing assistance for the poor. This report provides a comprehensive summary of existing research on the HOPE VI program. Its central purpose is to help inform the ongoing debate about the program’s achievements and impacts, and to highlight the lessons it offers for continuing reforms in public housing policy.

HOPE VI grew out of the work of the National Commission on Severely Distressed Public Housing, which was established by Congress in 1989. Congress charged the Commission with identifying “severely distressed” public housing developments, assessing strategies to improve conditions at these developments, and preparing a national action plan for dealing with the problem. Based on its investigation, the Commission concluded that roughly 86,000 of the 1.3 million public housing units nationwide qualified as severely distressed and that a new and comprehensive approach would be required to address the range of problems existing at these developments.

In response to these findings, Congress enacted the HOPE VI program, which combined grants for physical revitalization with funding for management improvements and supportive services to promote resident self-sufficiency. Initially, housing authorities were allowed to propose plans covering up to 500 units with grant awards of up to $50 million. (Introduction to an Urban Institute report)

I should clarify the HOPE VI program isn’t limited to only remaking high-rise public housing, but that is the type of distressed public housing we had in St. Louis. Other cities, like Chicago, also used it to replace high-rise projects. Cabrini-Green, for example.

Let’s take a look at the four St. Louis high-rise public housing projects that were replaced with low-rise housing built on a more traditional street grid.

Darst-Webbe

The Darst-Webbe towers on the near south side circa 1990-91, razed

This was officially known as the J.M. Darst Apartments and the A.M. Webbe Apartments. The Darst apts., opened in October 1956, occupied 14.75 acres bounded by Lafayette, Hickory, Tucker (12th) & 14th.  The four 9-story buildings contained 645 units.  The Webbe apts. opened in May 1961 between the Darst apts. and Chouteau.  It had a mix of buildings on 12.27 acres: two 9-story, one 12-story, and one 8-story. These four buildings had 580 units.  The combined Darst-Webbe then had 1225 apartment units on 27.02 acres.

This was the first high-rise public housing project in St. Louis to be razed and rebuilt under the HOPE VI program. In its place is a mix of apartments and privately-owned single-family homes. On the south is King Louie Square apartments, with 152 1-4 bedroom units. In the middle of the redevelopment site is the single-family homes, called La Saison. Habitat for Humanity is building new homes here on the few vacant lots remaining. The north part of the original site contains more apartments, called Les Chateaux — with 40 1-2 bedroom units.

House at La Saison on Tucker near Park Ave, the north edge of King Louie Square can be seen on the left. Photo December 27, 2013.
Looking north on 14th street toward LaSalle. The buildings on the left are rental townhouses in the redevelopment area, just not sure if they have a name. Photo: November 7, 2018.

In 1995 HUD gave the St. Louis Housing Authority a grant of $46.7 million to redevelop Darst-Webbe. Defunct developer Pyramid Construction is responsible for the pretentious names.

Vaughn

This was two projects, both called G.L. Vaughn Apartments. The first, opened in June 1957, was bounded by Cass, O’Fallon, 18th, and 20th. It had four 9-story towers on 16.67 acres — with 647 units. The second opened at the NE corner of 20th & O’Fallon in September 1963. Basically this was just an expansion of the project that opened six years earlier, it had one 8-story building on 2.05 acres, 112 units.

The last Vaughn tower being razed in October 2006.
New housing, called Murphy Park, had already been built where the other four towers had been razed.
The Murphy Park senior building and management offices.
Looking south on Vinson Street from a new park on Biddle Street.

Vaughn was completed, to the best of my knowledge without the use of a HUD HOPE VI grant, but like others it got state low income tax credits.

 The partnership event highlighted Phase III of Murphy Park. Its 126 units will bring to 413 the total number of rental dwellings built in the neighborhood that once was the site of the notorious George L. Vaughn public housing high-rises. One third of the completed project will be market rate apartments, with the balance constructed as tax credit units – with just more than half available for public housing-eligible families as part of the replacement of the former public housing complex. Units range from two to six bedrooms and include disability-accessible garden apartments. Each apartment features full size appliances including washer and dryer, refrigerator, stove and dishwasher. McCormack Baron Management Services, the management agent, reports that Phases I and II (completed in 1997 and 2000) have high-90 percent occupancy. Phase III units will be available in March 2003. (HUD)

As the above indicates, this was a McCormack Baron development.

Blumeyer

This was officially the A.A. Blumeyer Apartments. It opened in October 1968, bounded by Compton, Delmar, Grand & Page. It had two 14-story buildings for “elderly”, three 15-story buildings, and forty-two 2-story buildings. There was a total of 1,152 units on 33.90 acres.

Low-rise & high-rise buildings at Blumeyer before being razed. Photo October 2006
Blumeyer Elderly Apartments on Page, January 2007

This was replaced by the Renaissance Place at Grand apartments and the offices of the St. Louis Housing Authority.  To the north, across Dr. Martin Luther King Blvd, Senior Living at Renaissance Place was built on land not part of Blumeyer.  Additionally, the North Sarah Apartments were built on…North Sarah… to provide additional units.

New apartment within a grid of new streets in February 2013, the last Blumeyer tower in the background — demolition on it began in the fall of 2014

The $35 million dollar HUD grant was issued in 2001. Like Vaughn, this was a McCormack Baron project.

Cochran

Officially the J.J. Cochran Garden Apartments.   Completed in April 1953, it was St. Louis’ first high-rise public housing project — more than two years before Pruitt Homes and three years before Igoe Apartments. The 18.03 acre site contained four 12-story, two 7-story, and six 6-story towers — containing 703 units. It was built to clear out old tenemts businesses on the north edge of the business district didn’t like. Then Cochran became a problem, but tenants pushed for the ability to self manage — and won!

Cochran Gardens was a public housing complex on the near north side of downtown St. Louis, Missouri. Construction was completed in 1953. The complex was occupied until 2006, it was famous for its residents’ innovative form of tenant-led management. In 1976, Cochran Gardens became one of the first U.S. housing projects to have tenant management. Built by the same firm, Leinweber, Yamasaki & Hellmuth, as the infamous Pruitt–Igoe complex, Cochran Gardens was more successful than its ill-fated sister project. In the mid 1970s, Bertha Gilkey and a group of friends successfully led a community driven rehabilitation effort; in 1976 she won a property management contract from the city. Independent management improved Cochran Gardens and created small business jobs in the neighborhood. President George H. W. Bush visited the site in 1991, commending tenant management and Bertha Gilkey. However, in 1998 city authorities took over Cochran Gardens, citing tax mismanagement by the tenant association. The buildings rapidly deteriorated, by 1999 vacancy rate increased from under 10% to one-third. (Wikipedia)

I photographed the area in May 2007 as towers still existed and as new construction was going up, streets going in.

The last high-rise tower from the Cochran Gardens project was razed in 2011. This is 9th & O’Fallon on May 29, 2007.
At 7th & O’Fallon you can just see the historic Neighborhood Gardens project on the left, new Cambridge Heights apartments on the right. In the background is an old Cochran tower about to be demolished. Note traffic signals were still in place along 7th street.
From 9th street we can see the other side of the Cochran tower before demolition, and new townhouses facing 8th street. The building on the horizon is on 7th, was part of McGuire Moving & Storage.
Project sign
Looking to the left we see more new townhouses between 8th & 9th
Looking south on 8th Street from Dickson Street. Dickson Street didn’t exist between 7th and 9th prior to Cochran, but the street name was used east of 7th. Eighth street was removed for Cochran, it was mostly rebuilt.

This project was completed by an LLC that includes architect Michael Kennedy of KAI (previously known as Kennedy Associates, Inc). McCormack Baron was management from the very beginning, until February of this year. In a future post I’ll go into more detail on Cochran Gardens & Cambridge Heights.

Summary

These four areas are all significantly better because of each redevelopment. The New Urbanist influence has been a key factor in their success. The buildings in all four orient toward the public street. HOPE VI projects have valid criticism, largely the reduction in the number of public housing units for the very low income. The other is the charge of gentrification, a valid claim in other cities but not in St. Louis. More on that in the future.

— Steve Patterson

 

New Book — ‘Growing Up St. Louis: Looking Back Through the Decades’ by Jim Merkel

September 25, 2020 Books, Featured Comments Off on New Book — ‘Growing Up St. Louis: Looking Back Through the Decades’ by Jim Merkel

Though I’ve lived in St. Louis for over three decades, I didn’t grow up here. This book is fascinating because you can read stories from over 100 people who did grow up here.

No matter when or where we grow up, the stories, people, and places that populate our memories leave an indelible mark on the manuscript that becomes our life story. A day at the Louisiana Purchase Exposition in 1904, meatless meals and hard times during the Great Depression, or knowing Mark McGwire’s precise homerun count that summer of 1998 become galvanized in our own timelines, while other details fade into the background.

In Growing Up St. Louis, hear the stories that stuck with more than a hundred native St. Louisans over the last century, told by the very people who lived through them. Ranging from joyous to humdrum, and even to the grim, these childhood memories offer a glimpse of life in still frame, from the start of the twentieth century to the present day. A young girl is transfixed by the Beatles debut on Ed Sullivan and a future local sportscaster falls in love with sports as he and his dad watch the 1968 World Series.

With new and old photographs to accompany the essays, join veteran author Jim Merkel on a journey through ten decades of coming of age in St. Louis. Whether they spark nostalgia or empathy, they’ll surely provoke commentary about how deeply our tender years impact us for the rest of our lives. (Reedy Press)

I haven’t read all the stories, but I’ve read quite a few. Merkel has done a good job of presenting a variety of people. City & county, black & white, rich & poor, etc.

I can only imagine the stories to be told in 50-60 years about growing up in the 2020s.

— Steve Patterson

 

Our November 3rd Ballot Is Long, Begin Your Research Now

September 23, 2020 Featured, Politics/Policy Comments Off on Our November 3rd Ballot Is Long, Begin Your Research Now
The St. Louis Board of Election Commissioners is on the first floor at 300 N. Tucker (@ Olive)

I’d imagine most of you know how you’ll vote in the upcoming presidential election. There are five tickets for president, but it’s only between two for most voters. But what about the rest of the ballot? Your civic duty doesn’t end with the presidential race.

In-person absentee voting began yesterday, so now is a good time to review the ballot. This post doesn’t include any endorsements, nor do I try to persuade you from voting one way or another. My goal is that each of you makes informed decisions on all items on the ballot — not just the top race or two.

Here are some resources to help you:

Here are the races on our ballot:

  • President & Vice-President
  • Missouri Executive Offices: (Governor, Lt. Gov, Secretary of State, Treasurer, Attorney General)
  • U.S. Representative (this depends on your district. Cori Bush will win district 1 while District 2 is a close race between Ann Wagner & Jill Schupp).
  • State Senator
  • State Representative
  • STL Circuit Attorney
  • STL Sheriff
  • STL Treasurer
  • Retain judges? From state Supreme Court to circuit judges: St. Louis City & St. Louis County
  • CONSTITUTIONAL AMENDMENT 1
    Do you want to amend the Missouri Constitution to extend the two term restriction that currently applies to the Governor and Treasurer to the Lt. Governor, Secretary of State, Auditor and the Attorney General?
    State and local governmental entities estimate no costs or savings from this proposal.
    YES – FOR THE AMENDMENT
    NO – AGAINST THE AMENDMENT
    .
  • CONSTITUTIONAL AMENDMENT 3
    Shall the Missouri Constitution be amended to:
    * Ban gifts from paid lobbyists to legislators and their
    employees;
    * Reduce legislative campaign contribution limits;
    * Change the redistricting process voters approved in 2018
    by: (i) transferring responsibility for drawing state legislative districts from the Nonpartisan State Demographer to Governor-appointed bipartisan commissions; (ii) modifying and reordering the redistricting criteria.
    State governmental entities expect no cost or savings. Individual local governmental entities expect significant decreased revenues of a total unknown amount.
    YES – FOR THE AMENDMENT
    NO – AGAINST THE AMENDMENT
    .
  • PROPOSITION D
    Shall the City of St. Louis adopt an ordinance to:
    * establish an open, non-partisan system for elections to the
    offices of Mayor, Comptroller, President of the Board of
    Aldermen, and Alderman
    * enable voters to choose all the candidates they wish in the
    open, non-partisan primary
    * allow the top two candidates to then compete in a runoff
    general election?
    YES – FOR THE PROPOSITION
    NO – AGAINST THE PROPOSITION
    .
  • PROPOSITION 1
    Shall Section 2 of Article VIII of the City of St. Louis Charter, which requires all officers and employees of the City of St. Louis to reside within the City’s boundaries, be amended to permit the employees of the City of St. Louis except for City agency and department directors appointed by the Mayor to reside outside of the City’s boundaries?
    YES – FOR THE PROPOSITION
    NO – AGAINST THE PROPOSITION
    .
  • PROPOSITION R
    Shall the City of St. Louis levy an additional tax of six cents per each one hundred dollars ($100.00) of assessed valuation as authorized by Section 210.860 R.S.Mo. for the purpose of providing additional funding for community children’s services, in particular early childhood services for children aged five years and under, in addition to the current levy of nineteen cents per each one hundred dollars ($100) of assessed valuation?
    YES – FOR THE PROPOSITION
    NO – AGAINST THE PROPOSITION
    .
  • PROPOSITION T
    Should Chapter 23 of the Revised Code of the City of St. Louis be amended to impose a gross receipts tax of seven and one half percent of the gross receipts obtained from Telecommunications Providers, which are and include every entity now or hereafter engaged in a general telecommunication business in the City, providing telecommunication, telecommunications exchange, or local, toll, or long distance, telephone service to its customers with a service or billing address within the St. Louis City limits; and Fiber Networks Providers, which are and include every entity now or hereafter engaged in providing fiber networks, built whole or in part in the City’s public right of way, which are not internet or service providers subject to franchise fees, to customers and other users of fiber networks?
    YES – FOR THE PROPOSITION
    NO – AGAINST THE PROPOSITION

Again, I ask that you take the time to look into all the races & ballot questions before you’re voting absentee or in person on November 3rd.

— Steve Patterson

 

 

New Book — ‘Forest Park: A Walk Through History’ by Carolyn Mueller

September 22, 2020 Books, Featured Comments Off on New Book — ‘Forest Park: A Walk Through History’ by Carolyn Mueller

Forest Park, opened in 1876, is larger than NYC’s Central Park. It had already been open over a quarter century when the Word’s Fair opened in 1904 in the park.  Today’s book is a guidebook to help you walk through thr park, exploring the many areas and historic  structures. Because the park is so large the book has eight different walks.

Perched just inside the city, Forest Park has functioned as a proverbial playground for generations of St. Louisans and tourists alike. While you could explore this green expanse of trees and pathways by many modes of transportation, the best way to know its paths and treasures is on foot. With Forest Park: A Walk through History as your guide, you’ll be able to take the time to appreciate the park’s historical markers and natural wonders.

Discover the hills, fields, and winding ribbons of water traversing the park. Find the Louisiana Purchase Exposition. From the monuments to the memorials and the waterfowl to the wildflowers, Kennedy Forest, the Bridge to Picnic Island, and the Saint Louis Zoo.

Local author Carolyn Mueller brings an insider’s perspective after spending a decade living near the park and countless hours exploring its bike paths and running trails. Check out her favorite spots like Kennedy Forest, the Bridge to Picnic Island, and the Saint Louis Zoo, or discover your own as you venture into this crown jewel of St. Louis. (Reedy Press)

I’ve not yet taken the book to Forest Park to follow one of the tours, but with Fall weather I’ll do it soon.

— Steve Patterson

 

Grand Bridge/Viaduct Not Looking So Good After Only Eight Years

September 16, 2020 Featured, Planning & Design, SLU Comments Off on Grand Bridge/Viaduct Not Looking So Good After Only Eight Years

The ribbon for the $20-$30 million Grand bridge/viaduct was cut on August 25, 2012. It looked great that day. Now, eight years later it is not looking so fresh.

August 25, 2012 @ 10:30am
The many planters along both sides that day had lots of plants.
The plants were a wide variety.

On Monday (9/14/2020) I crossed both sides, end to end.

Approaching from the south one light is broken off. The next is just a pole — no top.
Weeds new growing in the cracks, the planters are empty.
The drains are all clogged with trash, etc.
At ome point the entire structure has settled, this means both sidewalks now have a vertical point that exceeds ADA guidelines.
The settlement line is visible in the median as well. The curb here will continue to deteriorate unless repaired.

Ribbon cuttings are appealing to politicians, especially those running for additional terms. Being able to tout millions of dollars in new investment is great for a resume.

Routine maintenance, on the other hand,  isn’t glamorous. The media doesn’t send out a reporter/photographer. So we spend millions building new stuff then fail to maintain it. I think Saint Louis University had originally planted the planters, but they’ve had a change of leadership since.

You may not notice driving across, but this bridge is now an embarrassment. It’s no longer ADA-compliant.

— Steve Patterson

 

Advertisement



[custom-facebook-feed]

Archives

Categories

Advertisement


Subscribe