Home » Downtown » Recent Articles:

Downtown’s Papa John’s Pizza To Reopen In Different Parking Garage

After Papa John’s Founder & CEO John Schnatter commented on the Affordable Care Act during the 2012 presidential campaign I stopped patronizing the downtown location — then located just 4 blocks East. My taste buds, waistline, and wallet were grateful.

Pape John's was located at Tucker & Pine until July when it closed for repairs to this parking garage.
Pape John’s was located at Tucker & Pine until July when it closed for repairs to this parking garage.
Workers building out the interior of the new Papa John's 2 blocks South in the Park Pacific garage.
Workers building out the interior of the new Papa John’s 2 blocks South in the Park Pacific garage.

It will be nice seeing a business in these storefronts facing Tucker, the spots facing Pine are occupied. More space remains available facing Tucker & Olive.

Renovation work at the garage where Papa John’s had been located (see Parking Garage Undergoing Time-Consuming Multi-Million Dollar Restoration; Businesses Closed, Jobs Lost) has slowed to be almost nonexistent. Yesterday the security guard told me what I already suspected — there was far more damage than originally thought. The owner isn’t sure how much more they want to put into it but a couple of guys are still around working — but nothing like the crew when the work first started.

How long can the owner keep a garage that’s producing zero income?

— Steve Patterson

 

Homeless Need Housing Longer Than Overnight

Over the years many have said us downtown loft dwellers don’t want to see the homeless, which is why we want to close Larry Rice’s overnight emergency shelter NLEC. This view many be valid for some of my neighbors, but it doesn’t apply to me or most no doubt, it is heart-wrenching to see people sleeping in doorways, carrying all their possessions in a trash bag. What the solution?

Last year the Board of Adjustment ruled NLEC is a nuisance, in May 2015 must limit beds for homeless to 32 or close
Last year the Board of Adjustment ruled NLEC is a nuisance, in May 2015 must limit beds for homeless to 32 or close

Overnight shelters, like NLEC, do provide a cot, a sandwich, and perhaps a shower — for 12 hours. The next morning they’re sent back out into the streets. The cycle repeats without getting to the root problems that caused the person to become homeless. To me keeping the homeless just above water is cruel.

The homeless can’t do it on their own, none of the world’s deities are going to help either. It’s entirely up to us — baloney sandwiches and an overnight cot aren’t enough.

Only from the stability of a small apartment can they hope to get substance issues under control, learn to prepare meals, be able to get/hold a job. This is unlikely on the street.

Emergency overnight shelters are still necessary when the weather is extreme, but only as a short-term solution. The total cost per person is less when they’re in an apartment vs on the street.

Everyone benefits — except those whose business model is based on hundreds remaining on the streets.

— Steve Patterson

 

Someone Tell Google Maps: 8th & Pine Is The Arch Station

February 23, 2015 Downtown, Featured 6 Comments

The other day I noticed a sign on MetroLink promoting 8th & Pine as the station for visiting the Arch.

Metro is now encouraging MetroLink riders to use the 8th & Pine station to reach the Arch
Metro is now encouraging MetroLink riders to use the 8th & Pine station to reach the Arch

Since our original light rail line opened in 1993 the Laclede’s Landing station has been the most direct but given the planned new West-facing museum entrance it’s logical to begin directing visitors through downtown to reach the Arch. Also planned demolition of the North Arch parking garage that pedestrians walked through will be a confusing mess until the grounds are finished.

Someone really should tell Google and other mapping services:

Google still directs users to the Laclede's Landing station. Mapped on Friday February 20, 2015
Google still directs users to the Laclede’s Landing station. Map image created on Friday February 20, 2015, click to check current routing

I also tried to use Metro’s Trip Planner but got the following message on two different browsers: “Error 500. The server was unable to complete your request.”

Hopefully someone from Metro has already contacted Google Maps to change their routing to the Arch. The other helpful thing would be to locate wayfinding at 8th & Pine to help orient visitors coming up from the underground rail line, I’ve given directions to hotels & the Arch from that station numerous times. It’s actually two stations — one for each direction of travel.

I have no idea how we plan to map drivers to numerous downtown parking garages — until now mapping services have directed motorists to the North garage.

— Steve Patterson

 

Fortieth Anniversary of Laclede’s Landing Redevelopment

Four decades ago today — February 19, 1975 — the Board of Aldermen took at step to save what little remained of the oldest part of the city:

A group of downtown bankers and businessmen, led by William Maritz announced the formation of a corporation to oversee development of the tiny group of remaining buildings along the riverfront levee. The Laclede’s Landing Redevelopment Corporation was approved by the Board of Aldermen, which allowed interested owners to retain and improve their properties. Through the 1960’s several proposals were put forth for the area, including one shortsighted suggestion of complete demolition. The area was listed on the National Historic Register in 1976, the first commercial district in St. Louis to do so. Laclede’s Landing has since been on a steady upward path, with several local architects contributing to its renovation. The name “Laclede’s Landing” is a relatively recent name that has been given to the site, as there were nearly 150 more blocks of a similar character that made up the St. Louis riverfront before the creation of the Jefferson National Expansion Memorial. (STL250 via Facebook)

The bulk of the original city had been razed 35+ years before to make room for a riverfront memorial — eventually the Arch we know today. In 1975 the Arch was open but the grounds not yet landscaped, the north garage not yet built.

In the last four decades the area hasn’t been stagnant, buildings have been renovated while others have been lost. Most recently some sidewalks were improved, made more accessible.

Workers rebuilding curbs & sidewalks along N. 2nd St, November 2013.
Workers rebuilding curbs & sidewalks along N. 2nd St, November 2013.
One of the new sidewalks along N. 2nd, November 2014
One of the new sidewalks along N. 2nd, November 2014
It was announced a park was planned for the north side of the Eads Bridge, to the right of the trucks parked in the alley,
A park is planned for the site where the Switzer building collapsed (north side of the Eads Bridge, to the right of the trucks parked in the alley) March 2014 photo.

Despite recent progress, this summer a big employer will leave Laclede’s Landing:

Following an extensive search, the Bi-State Development Agency (BSDA) is excited to announce the relocation of its headquarters to the Metropolitan Square Building at 211 North Broadway in downtown St. Louis. The move is planned for summer 2015.

Since 1982, BSDA has occupied space at 707 North 1st Street, which currently serves as the agency’s headquarters for the Metro transit system, the Gateway Arch tram and ticket operations, St. Louis Downtown Airport, the new St. Louis Gateway Freight District, and the Gateway Arch Riverboats. The 117-year old building has approximately 100,000 square feet of floor space. (NextStopSTL)

Links:

Hopefully other businesses will take over the space that’ll be vacated by Metro! I’m grateful that decades ago some saw the value of holding on the last remnants of the old city.

— Steve Patterson

 

Arch Construction Started 52 Years Ago Today

February 12, 2015 Downtown, Featured, History/Preservation Comments Off on Arch Construction Started 52 Years Ago Today

After more than two decades as a vacant site, work on a Jefferson Westward Memorial was finally started 52 years ago today.

ABOVE: Slope down to the north below grade museum entrance.
The Gateway Arch.

At the beginning of the 20th century our leaders wanted to raze the historic riverfront and pay tribute to the Louisiana Purchase.  In October comes the 50th anniversary of the final piece of the Arch being lowered into place. It’ll be a few more years before we can celebrate the half century mark of being able to visit the top of the Arch.

— Steve Patterson

 

Advertisement



[custom-facebook-feed]

Archives

Categories

Advertisement


Subscribe