Home » Featured » Recent Articles:

Sunday Poll: Best Alternatives For Future Transportation Funding?

Please vote below
Please vote below

At state & federal levels, money for transportation infrastructure is running out; fuel taxes haven’t been raised in years, vehicles are more fuel efficient, electrics are set to go mainstream, etc.  States, like Illinois are looking at other ways to fund construction & maintenance:

There is a proposal in Illinois for the state to put a device on cars to see how many miles citizens are driving.

The state would take that data to use in order to charge a tax on drivers depending on miles driven. It’s all in an effort to make money because the state is losing out on gas tax revenue thanks to more fuel efficient cars on the road. (KMOV)

Other states are testing the same idea, driving more miles costs you more. Which brings us to today’s poll — using alternatives listed in the WSJ:

The poll answers are in random order, open until 8pm.

— Steve Patterson

 

 

Reading: The Future of the Suburban City: Lessons from Sustaining Phoenix by Grady Gammage Jr.

April 22, 2016 Books, Featured, Suburban Sprawl Comments Off on Reading: The Future of the Suburban City: Lessons from Sustaining Phoenix by Grady Gammage Jr.
Click cover image to view publisher's page -- which includes a preview
Click cover image to view publisher’s page — which Reincludes a preview

Many Western cities aren’t as dense as Eastern & rust-belt cities, but residents still desire to live sustainably. Though St. Louis was a dense rust-belt city, bad decisions have turned it into an unsustainable mess largely suburban mess. But, we can learn from others on how to dig ourselves out.

A recent article, The Santa Fe Strategy: How Small Cities Can Act on Climate and Inequality, explored these issues. A new book goes deeper:

There exists a category of American cities in which the line between suburban and urban is almost impossible to locate. These suburban cities arose in the last half of twentieth-century America, based largely on the success of the single-family home, shopping centers, and the automobile. The low-density, auto-centric development of suburban cities, which are largely in the arid West, presents challenges for urban sustainability as it is traditionally measured. Yet, some of these cities—Los Angeles, Las Vegas, Phoenix, Salt Lake, Dallas, Tucson, San Bernardino, and San Diego—continue to be among the fastest growing places in the United States.

In The Future of the Suburban City, Phoenix native Grady Gammage, Jr. looks at the promise of the suburban city as well as the challenges. He argues that places that grew up based on the automobile and the single-family home need to dramatically change and evolve. But suburban cities have some advantages in an era of climate change, and many suburban cities are already making strides in increasing their resilience. Gammage focuses on the story of Phoenix, which shows the power of collective action — government action — to confront the challenges of geography and respond through public policy. He takes a fresh look at what it means to be sustainable and examines issues facing most suburban cities around water supply, heat, transportation, housing, density, urban form, jobs, economics, and politics.

The Future of the Suburban City is a realistic yet hopeful story of what is possible for any suburban city. (Island Press)

The table of contents:

Prologue. Getting Through the Haboob

Chapter 1. Suburbs, Sprawl, and Sustainability
Chapter 2. Just Add Water
Chapter 3. Coping with Heat
Chapter 4. Transportation and the Suburban City
Chapter 5. Houses, Shopping Centers, and the Fabric of Suburbia
Chapter 6. Jobs and the Economy of Cities in the Sand
Chapter 7. Politics, Resilience, and Survival

Afterword. Planning to Stay

Our regions can’t just keep expanding outward the way they did the last 50-60 years. We must improve existing suburbia.

— Steve Patterson

 

Expanded Civic Center MetroBus Transit Center Will Reopen In Fall 2017

The Civic Center MetroBus Transit Center, at 14th & Clark, is now closed for the next 18 months. It will be redone to handle more buses — and longer buses.

Tuesday 4/19 dignitaries each tossed a shovel of dirt to kick off the new project.
Tuesday 4/19 dignitaries each tossed a shovel of dirt to kick off the new project.

In May 2014 I posted about the future plans for the redo, see Civic Center Transit Center Sans Trees, Awaiting Redo

The trees had just been cut down in May 2014
The trees had just been cut down in May 2014
Sign announcing expansion project
Sign announcing expansion project

Then, in July 2014m I posted that the  Triangle Park Plaza Is Useless Public Space, In Poor Condition. At that time I included the design.

New design, as of July 2014
New design, as of July 2014

b

Construction will expand the Civic Center Transit Center and triple the current number of bus bays, which will allow MetroBus passengers to connect with all of their bus routes inside the transit center and out of vehicular traffic on 14th Street. A new building will also be constructed on  the site that will feature new passenger amenities, including public restrooms, an indoor waiting area, digital boards with MetroBus arrival times, a concession area and a Metro Public Safety substation.

“It is our duty to ensure that residents, workers, tourists and visitors can travel safely and efficiently throughout the bi-state region,” said Ray Friem, Executive Director of Metro Transit, “and that they enjoy the best possible transit system and experience we can provide.”

Metro successfully secured federal funding to rebuild the Civic Center Transit Center, and those funds will support 80 percent of the total project cost of $10.5 million. “The competition for federal transit dollars is intense,” said Mokhtee Ahmad, Regional Administrator for the Federal Transit Administration, Region VII. “Bi-State Development and Metro are to be commended for being so diligent and fiscally conscientious in maximizing federal transit funds to get taxpayers the highest return on their investment.”

b

The design has changed.

Latest plan, click image to view larger PDF on Scribd
Latest plan, click image to view larger PDF on Scribd

The ramp down to the MetroLink platforms is much more direct — but steeper than previously drawn. The other changes are at the North end. There’s now an accessible route from the center bays/canopies to Triangle Park. The “park” is also different — the metal panels (shown in first photo, above) will go away. A 2nd sculpture is shown right in front of the accessible route — a potential problem.

Close-up of Triangle Park
Close-up of Triangle Park

I also don’t get having a new sculpture next to the existing one.We’ll see how it turns out in 18 months.

— Steve Patterson

 

 

 

 

Downtown>Hampton>IKEA>Downtown Part 2

Yesterday, in Part 1, I talked about the two different transit I’d taken (MetroLink, #90 & #32 MetroBus) and issues faced as a pedestrian trying to navigate in between.  I’d made it to IKEA for shopping, followed by lunch.

I'm obsessed with food so naturally I took a pic of my plate: Veggies balls with vegetarian black bean sauce,, steamed veggies, Swedish apple cake, and tap water.
I’m obsessed with food so naturally I took a pic of my plate: Veggies balls with vegetarian black bean sauce,, steamed veggies, Swedish apple cake, and tap water.
When I was done with lunch the rain had resumed.
When I was done with lunch the rain had resumed.

I checked the transit options, it would be a while before a MetroBus stopped out front. Plus, that would only get me to Lindell where I’d have to wait in the rain for the #10. The Grand MetroLink is closer than the CWE MetroLink, but Forest Park is the most direct route and I recall some access issues the last time. Plus, my transfer from earlier was now long expired.

No matter what I’d be in the rain, so I decided to just roll home — 2.9 miles. I’ve done it a few times before, though not in the rain. I’m still wearing a poncho to keep me and the controller on my chair dry. My shoes, however, get soaked.  North on Vandeventer to Lindell. I stayed on the West side of Vandeventer because I’m bot sure if the city ever got around to the huge gaps in front of the curb ramps on the NE corner of Vandeventer & Forest Park. At Lindell, I checked the schedule again — I can get home before the next bus would arrive.

Because of the rain I only took a few pictures. The following week I took the bus to Lindell & Spring to backtrack and take pictures of things I saw in the rain.

Lindell & Spring, the crowd passed the walk button. Not sure if required.
Lindell & Spring, the crowd passed the walk button. Not sure if required.
New traffic signals being installed at the Lindell/Olive intersection. April 6th
New traffic signals being installed at the Lindell/Olive intersection. April 6th
This signal is long overdue! In the background the Hotel Ignacio is getting its EFIS facade repaired
This signal is long overdue! In the background the Hotel Ignacio is getting its EFIS facade repaired
How many years ago did I post about the need for painted crosswalk lines here? August 2011 -- click image for post.
How many years ago did I post about the need for painted crosswalk lines here? August 2011 — click image for post.
Olive & Compton, no need to push the button tho cross Compton. If you want to cross Olive you must press the button.
Olive & Compton, no need to push the button tho cross Compton. If you want to cross Olive you must press the button.
At Ewing is a ramp my powerful chair cannot get up -- the vertical height is too much. April 6th
At Ewing is a ramp my powerful chair cannot get up — the vertical height is too much. April 6th
The same ramp again. Like hundreds/thousands of curb ramps it was built too high relative to the paving. Plus, like so many, the paving right in from is partially missing. I have to role in Ewing a little bit to get to a driveway.
The same ramp again. Like hundreds/thousands of curb ramps it was built too high relative to the paving. Plus, like so many, the paving right in from is partially missing. I have to role in Ewing a little bit to get to a driveway to get onto the sidewalk.
The West side at Ewing & Olive is another issue. The concrete at the top has caved in. .
The West side at Ewing & Olive is another issue. The concrete at the top has caved in between the top of the ramp and the access panel.
I've not tried to go up this ramp. it might also be impossible
I’ve not tried to go up this ramp. it might also be impossible
At Leffingwell you must press the button to get a walk signal to cross Olive -- even when traffic has a green light
At Leffingwell you must press the button to get a walk signal to cross Olive — even when traffic has a green light
At Olive & 20th I saw the buttons in the rain, they were far away. To cross 20th you needed to be over by Olive and vice versa.
At Olive & 20th I saw the buttons in the rain, they were far away. To cross 20th you needed to be over by Olive and vice versa.
When I went back I confirmed no button is needed to cross 20th but you do need to press a button top cross Olive. The signs are wrong, the button next to each crosswalk is what is wired.
When I went back I confirmed no button is needed to cross 20th but you do need to press a button top cross Olive. The signs are wrong, the button next to each crosswalk is what is wired.

Used to be — but no curb ramp is missing for the nearly 3 mile trip. If I tried to use Locust there are many missing curb ramps.

I still fail to understand why all the cost of the buttons when they don’t need to be pushed in the East-West direction. And why have to press a button to get a walk signal when vehicles from side streets get a green light?  This is how we’ve spent money — building infrastructure that frustrates this pedestrian!

— Steve Patterson

 

Downtown>Hampton>IKEA>Downtown Part 1

The morning of April 6th I had a 9am appointment on Hampton Ave, between Columbia & Elizabeth. It was raining off and on that day. Today’s post is about the journey there & back.

I had originally planned to take MetroBus there, but I didn’t have any two-hour passes so I’d get a transfer for the 2nd bus. So I went to the Union Station MetroLink station, purchased a few passes, validated one, boarded a Westbound train to the Forest Park MetroLink station. Just before a Southbound #90 (Hampton) MetroBus arrived it began to sprinkle. I left home in a poncho to keep  and my wheelchair’s controller dry.

View out a Southbound #90 MetroBus on Hampton about to cross over I-64. Traffic was backed up on the highway and WB on ramp
View out a Southbound #90 MetroBus on Hampton about to cross over I-64. Traffic was backed up on the highway and WB on ramp

After taking care of business at two places on Hampton, I wanted to visit IKEA to shop and have lunch. The most direct route was a short ride on a Northbound #90 (Hampton) MetroBus, then take a #32 (Chouteau-Manchester) MetroBus to Vandeventer. But when I was ready to leave it was going to be a while before the next #90 arrived, I might as well just roll it.

I’ve gone up to Clayton Ave before, so I knew  I could manage — it was about 3/4 of a mile from my starting point to Lloyd Ave. where I’d go right to make my way down to Manchester (map).   As I turned off Hampton onto Lloyd I was pleasantly surprised a sidewalk existed — I wasn’t sure that would be the case. However, a the bottom of the hill there was no sidewalk along Sulphur. Well, there is along the East side, but because of curbs, I couldn’t get to it.

At this point I had two options:

  1. Roll on the Sulphur Ave roadway, or
  2. Go back up to Hampton, cross, reach Manchester on the other side.

Looking at the time I thought I’d miss the next #32 if I went with the safer #2 option. So, when there was no traffic I quickly rolled South to Manchester. Whew…

The ADA ramp to cross Manchester is covered in a fine gravel. I can power over it but others would have difficulty.
The ADA ramp to cross Manchester is covered in a fine gravel. I can power over it but others would have difficulty.
Looking back where I'd been
Looking back where I’d been
The EB MetroBus stop. I wish it had a curb at the far right edge to prevent backing up too far and rolling down the hill.
The EB MetroBus stop. I wish it had a curb at the far right edge to prevent backing up too far and rolling down the hill.
Looking West to see the #32 coming. In September I posted about the danger of reaching one bus stop to the West -- clock image to view that post
Looking West to see the #32 coming. In September I posted about the danger of reaching one bus stop to the West — clock image to view that post

So the #32 MetroBus came right on time, my transfer was still valid, and it had stopped raining. I’d get off at Vandeventer Ave and roll North to IKEA — about a half a mile. So I got off at the last MetroBus stop before Vandeventer Ave., just had to cross one side street first.

Hemp Ave is between the bus stop and Vandeventer, but no curb ramp is visible. But be just out of view
Hemp Ave is between the bus stop and Vandeventer, but no curb ramp is visible. But be just out of view
Nope, just 100 feet from a bus stop there's no curb cut! I found a driveway I was barely able to use to get onto the sidewalk
Nope, just 100 feet from a bus stop there’s no curb cut! I found a driveway I was barely able to use to get onto the sidewalk
Looking North I'd hoped to cross here to stay on the West side of Vandeventer -- but pedestrians aren't allowed ri cross at this point
Looking North I’d hoped to cross here to stay on the West side of Vandeventer — but pedestrians aren’t allowed ri cross at this point
So I crossed Vandeventer, them crossed Manchester. The sidewalk design makes it clear to not go East on Chouteau.
So I crossed Vandeventer, them crossed Manchester. The sidewalk design makes it clear to not go East on Chouteau.
QuikTrip thinks this is a compliant pedestrian route. It's not.
QuikTrip thinks this is a compliant pedestrian route. It’s not.
Heading North, but I see a problem ahead. Initially I thought no sidewalk existed after the building on the right
Heading North, but I see a problem ahead. Initially I thought no sidewalk existed after the building on the right
But the tiny sidewalk has been blocked by Laclede Cab. Looking at city records, the public right-of-way is as wide as it is ned to the building -- the sidewalk should be wider!
But the tiny sidewalk has been blocked by Laclede Cab. Looking at city records, the public right-of-way is as wide as it is ned to the building — the sidewalk should be wider!
Continuing, I'm almost to Market St. JJs Clubhouse, a gay bar, is to the right
Continuing, I’m almost to Market St. JJs Clubhouse, a gay bar, is to the right
Turning left, I can see my destination--almost there!
Turning left, I can see my destination–almost there!
Rough surface that would be a challenge for many
Rough surface that would be a challenge for many
When the side on the right is soon developed, this sidewalk will be redone. Still, this was great compared to what I had just experienced
When the side on the right is soon developed, this sidewalk will be redone. Still, this was great compared to what I had just experienced
But when IKEA was built one time section was left as gravel and my chair couldn't get up over the vertical edge -- not with me in it. Unlike many, I'm fortunate enough to be able to stand on level ground. So I got up and the chair could then get up to the sidewalk.
But when IKEA was built one time section was left as gravel and my chair couldn’t get up over the vertical edge — not with me in it. Unlike many, I’m fortunate enough to be able to stand on level ground. So I got up and the chair could then get up to the new sidewalk.
Looking back we can see the tiny section left unfinished and inaccessible for more than half a year .
Looking back we can see the tiny section left unfinished and inaccessible for more than half a year .
Finally, I can now cross to IKEA.
Finally, I can now cross to IKEA.

Combined with public transit, I can cover miles as a pedestrian in my wheelchair — though our public rights-of-way are far from ideal. Looking at Google Maps it suggests using Sarah to reach IKEA instead of Vandeventer — no matter where you start from: Commerce, QuikTrip, Laclede Cab, even JJs Clubhouse! Yes, if you’re at Vandeventer & Market where you can see IKEA it suggests you cross Vandeventer and go West on Clayton Road to Sarah.

This isn’t a lack of money issue — it’s a lack of concern issue. Money is spent building infrastructure that doesn’t work for actual users. This mentality needs to change!

Tomorrow’s post will be about my trip back downtown from IKEA.