Home » Planning & Design » Recent Articles:

Beautiful Detailing On Older Infrastructure

Many of you have probably driven under the railroad tracks while traveling on Chippewa St between Gravois Ave and Meramec.

ABOVE: Chippewa going under the railroad tracks

If you’re like me you never paid much attention to the design of the underpass. But earlier this month I was on a MetroBus heading westbound on Chippewa and it had to stop at the light at Meremac (aerial) and there was the railing right next to the bus window.

ABOVE: Close up of railing on Chippewa at Meramec

I love the detail, so much more interesting than today’s infrastructure. Seems we either get boring stuff with zero detail or over the top designs. I’d much rather see a nice balance.

– Steve Patterson

 

Chouteau Bridge Sidewalk Cracked, Pedestrians Detoured Slightly

The Chouteau bridge (aerial) between 39th and Vandeventer opened on January 19, 2007 (source). The project to replace the old bridge was estimated at $16 million and “the construction contract was awarded to KCI Construction Company for $11.7 million.”

Knowing the bridge wasn’t very old I was surprised recently when I saw barricades on the south edge, then I received a press release from MoDOT:

ST. LOUIS – The Missouri Department of Transportation will close Chouteau Avenue (Route 100) between Vandeventer and Spring in both directions for periods of up to 10 minutes starting at 10 p.m. Tuesday, May 8. All lanes will be open by 6 a.m. Wednesday, May 9.

Crews are conducting load testing on the bridge to determine the best way to fix the sidewalk. The sidewalk has been closed since mid-2011. (MoDOT)

Fix a sidewalk on a five year-old bridge?

BIke/Walk Alert – Chouteau bridge between Vandeventer and 39th St.: During a recent inspection, MODOT found a crack in the sidewalk on the Chouteau Bridge and has closed the sidewalk while they investigate if the bridge is safe. MODOT plans to close one eastbound lane of Chouteau between Vandeventer and 39th and separate it from traffic with a concrete barrier. This lane will be a shared bike and pedestrian path until the sidewalk is repaired. Until the concrete barriers are in place, please use extreme caution when crossing the Chouteau Bridge or select an alternate route. Trailnet will post updates as we become aware of them. (Trailnet Facebook post on November 1, 2011)

With the barriers it’s possible to cross the bridge, although meeting someone in the middle would be a problem.

ABOVE: Looking east at the point where the sidewalk has been detoured
ABOVE: Paint on the new sidewalk in part of the outside drive lane
ABOVE: Markings and holes after the recent testing
ABOVE: Looking toward he main part of the bridge is west of Central Industrial Drive
ABOVE: Under the main span
ABOVE: The sidewalk along the shorter span to the east is also closed so it must have a crack as well
ABOVE: Looking west at the edge of the eastern span

I’ve not seen anything since the recent testing to indicate a solution. MoDOT hasn’t responded to my inquiry. Did Missouri get a warranty on this bridge?

– Steve Patterson

 

Rams Proposal For Edward Jones Dome Calls For Significant Changes To Structure And Broadway

As promised, Missouri Attorney General Chris Koster released the confidential proposal from the St. Louis Rams to the St. Louis Convention and Visitors Commission (CVC).

To Whom It May Concern:

In compliance with Chapter 610, the Missouri Sunshine Law, Attorney General Chris Koster made the following documents publicly available in response to various media inquiries and Sunshine requests regarding ongoing negotiations between the St. Louis Convention and Visitors Commission and its lessee.

Respectfully,

CHRIS KOSTER

Attorney General

Their proposal is significantly different than what the CVC had proposed. To me it seems like a new facility given how much would be entirely new.

ABOVE: Plan calls for removing most existing seating and the roof, moving the field 51'-8" to the east
ABOVE: Dome would be expanded across the existing Broadway and Baer Plaza

This means the dome is getting significantly larger than it is currently. The near corner of the drawing above includes access to the casino tunnel. The 2010 image below shows you where that is currently:

ABOVE: Baer Plaza with the Lumiere Link entrance in the foreground

As you can see that’s a lot of new building. Clearly the Rams want more than the lipstick the CVC proposed (see CVC Plan To Improve Dome Improves Broadway).

This brings up several thoughts:

  1. Perfect excuse to make 4th & Broadway each two-way rather than the current one-way configurations
  2. This would work well with the boulevard replacement of the I-70 elevated lanes, see CitytoRiver.org
  3. Unlikely the St, Louis region is going to pony up the money for this.

I haven’t read the proposal in detail yet. You can read the proposal here.

– Steve Patterson

 

Grand Ave MetroLink Station Taking Shape

The new Grand Ave Viaduct is moving along, it’ll open later this  year to vehicles first and then to MetroBus and MetroLink.

ABOVE: Feb 2010 drawing of the Scott Ave Transit Plaza being built now under the new Grand Ave Viaduct. Click image for source.

Originally I saw the graphics  pointing toward the platform and incorrectly assumed pedestrians would be able to cross Scott Ave and the westbound track at the center point under the new bridge, but the access point is the sidewalk to the west which I don’t think will offer much protection from rain.

ABOVE: Fence to keep people away from tracks is already in place
ABOVE: Sidewalk with track crossing is already poured

Two tracks are located between the platform and Scott Ave — the westbound MetroLink and an additional track I thought was going to be removed. It’s unclear how pedestrians will get from the grade-level crossing up to platform height.

Before those transferring to/from the #70 (Grand) MetroBus & MetroLink had a flight of stairs or elevator ride. Now they’ll have to cross a plaza, Scott Ave and one or two tracks.  We shall see when it opens if this is an improvement or a fail.

– Steve Patterson

 

White Flight, Urban Renewal & Population Loss

It’s true that some of St. Louis’ population loss can be attributed to “white flight” which is defined as:

the departure of whites from places (as urban neighborhoods or schools) increasingly or predominantly populated by minorities (Merriam-Webster)

But we mustn’t forget other factors that contributed to population loss  and that reasons for loss from 1950-1960 are different than those from 2000-2010.

The 1939 World’s Fair in New York is a good glimpse on the views of what 1960 could become, part one sets up the vision as detailed in General Motors’ Futurama exhibit:

httpv://www.youtube.com/watch?v=eNlgfkE9nWA

Part two looks at the rebuilt city of 1960:

httpv://www.youtube.com/watch?v=RtU_jNheyrQ

By 1947 St. Louis Comprehensive Plan detailed how this could become a reality here by 1970. From the introduction:

ABOVE: Plate 12 (Substandard dwelling units) from the 1947 Comprehensive Plan, click image for list of plates

 The Plan Commission confidently predicts that by 1970 barely a generation hence-the city proper can have 900,000 population. This would be an increase of only slightly more than 10 per cent since the 1940 census, but such a growth of 84,000 calls for making proper room for the new roofs, adequate traffic ways for the added automobiles, economical plans for all the additional public and semi-public facilities to be required. Furthermore, there must be a catching-up with all the improvements perforce neglected during the long war period.

With this mindset to rebuild the city to accommodate the expected 900,000 population by 1970 they proceeded to build vast highway networks and clear many dense neighborhoods.  Thousands of residents, businesses, churches, etc were taken by eminent domain to “improve” the city. For many who were displaced it was often easier to but a home in a suburb than to try to find a house in the city.

In 1950 many city residences were overcrowded. Floor boards were placed over dirt floors to create basement living quarters and others squeezed into flats. Yet thousands of housing units were razed to rebuild entire neighborhoods and highways. Even if your house remained your business might have been taken from you. With no where else to turn, those who could afford to do so left.

The population in 1970 was 622,236, down 234,560 from the 1950 peak of 856,796 just twenty years earlier. A far cry from the 900,000 they expected to occupy the rebuilt city by 1970!

Urban renewal forced many outside the city limits. By 1990, the year I moved to St. Louis, the population was down to 396,685. In the two decades from 1970-1990 the drop was 225,551, greater than the 1950-1970 drop and a much high percentage. But the reasons were different. The massive urban renewal projects were no more but the damage they caused lasting. You had white & black flight — the middle class got the hell out.

The drop from 1990-2010 was less in total numbers and percentages.

– Steve Patterson

 

Advertisement



[custom-facebook-feed]

Archives

Categories

Advertisement


Subscribe