Nineteen year ago I started this blog as a distraction from my father’s heart attack and slow recovery. It was late 2004 and social media & video streaming apps didn’t exist yet — or at least not widely available to the general public. Blogs were the newest means of …
The new NGA West campus , Jefferson & Cass, has been under construction for a few years now. Next NGA West is a large-scale construction project that will build a new facility for the National Geospatial-Intelligence Agency in St. Louis, Missouri.This $1.7B project is managed by the U.S. Army …
Book publisher Island Press always impresses me with thoughtful new books written by people working to solve current problems — the subjects are important ones for urbanists and policy makers to be familiar and actively discussing. These four books are presented in the order I received them. ‘Justice and …
This post is about two indirectly related topics: the new Siteman Cancer Center building under construction on the Washington University School of Medicine/BJC campus and an update on my stage 4 kidney cancer. Let’s deal with the latter first. You may have noticed I’ve not posted in three months, …
April 23, 2018Featured, TransportationComments Off on More Frequent Bus Service Should Begin Next Year
A year from now transit service in St. Louis City & County will likely be different than it is today. Metro, AKA Bi-State, has held informational meetings and hearings on their new plan they call Metro Reimagined. Light rail (MetroLink) will be largely the same, the plan focuses on the bus system. Wheeled (non para-transit) transit will be divided into four categories:
Enhanced Frequent: MetroBus routes with 15-minute or better service from morning to evening hours
Local: 30-minute service from morning to evening hours on most MetroBus routes
Commute Express: Regional service connecting Park & Ride lots to key employment destinations
Community Mobility Zones: Service areas using smaller vehicles, vanpools or shuttles, or mobility on-demand options
Right now only the #70 Grand is considered “enhanced frequent.” Here are the routes that could see improvements to frequency:
4 Natural Bridge
10 Gravois-Lindell
16 Metro City Limits
61 Chambers Rd
70 Grand
73 Broadway-Carondelet
74 Florissant
90 Hampton
94 Page
95 Kingshighway
The 73 isn’t the current 73 — it has been straightened out to improve efficiency. This less circuitous route means this line will not go down all the side streets it currently does.
The other big change comes to niche areas — called Community Mobility Zones, The colorful wrap on the 99 Downtown Trolley buses, shown below, has already been removed. These full length low-floor buses weren’t being driven as many miles as others in the fleet.
Most of the routes I use will get increased frequency, but I’m concerned about the wheelchair accessibility of whatever will replace the 99 Downtown Trolley. When that route began it used short high-floor buses, but later switched to full-length low-floor buses. A ramp is better than a lift — I was stuck on a malfunctioning lift once. But many smaller vehicles have a high floor which means a lift, increased boarding time, and may require securements due to a higher center of gravity. The convenient downtown circulator I use may not be so convenient anymore.
April 22, 2018Featured, Sunday PollComments Off on Sunday Poll: Was the Greitens Affair Consensual?
Last week a special House committee released a report on its investigation into the affair Eric Greitens had before he became Missouri’s governor:
He blindfolded and bound a woman to exercise equipment, spanked her, and tried to kiss her without her consent.
Those are among the scandalous allegations against Gov. Eric Greitens of Missouri that were released in a legislative report on Wednesday that has put the first-term Republican governor’s political future in deep trouble.
The report, the result of a House committee’s weekslong investigation into an extramarital affair that the governor admitted he had before he took office, has led to intense, bipartisan calls for him to step down. Mr. Greitens, however, insisted that he would not resign. (New York Times)
Here’s a quote relating to one aspect — consent:
While Greitens has described the extramarital relations as “consensual,” the woman, referred to only as Witness 1 in the report, said it included unwanted and potentially coerced sexual acts that she felt afraid to say no to and physical violence, in addition to the threat of photographic blackmail. (Washington Post)
Today’s poll is about this issue of consent. We’ve got two diametrically opposite stories on the subject — she claims it wasn’t consensual, Greitens says it was. .
This non-scientific poll will close at 8pm tonight. My thoughts on the subject on Wednesday.
April 20, 2018Board of Aldermen, Featured, History/PreservationComments Off on Pruitt-Igoe’s William Igoe Died 65 Years Ago; St. Louis Board of Aldermen Started New Session This Week
Sixty five years ago today the person for whom the intended white section of failed Pruitt-Igoe public housing project was named died at age 73:
William Leo Igoe (October 19, 1879 – April 20, 1953) was a United States Representative from Missouri.
Igoe was born in St. Louis to Irish immigrants. He attended the public and parochial schools of St. Louis and graduated from the law school of Washington University in St. Louis in 1902. He was admitted to the bar in the same year and commenced the practice of law in St. Louis. He was a member of the municipal assembly of St. Louis from 1909 until March 3, 1913, when he resigned to enter the United States Congress.
Igoe was elected as a Democrat to the Sixty-third and to the three succeeding Congresses (March 4, 1913 – March 3, 1921). On April 6, 1917, he joined 49 other representatives in voting against declaring war on Germany. He declined to become a candidate for renomination in 1920. He resumed the practice of law and was an unsuccessful Democratic nominee for mayor of St. Louis in 1925. He was chairman of the St. Louis Board of Police Commissioners 1933–1937. He died in St. Louis on April 20, 1953 and is buried in Calvary Cemetery. (Wikipedia)
At the beginning of this week the St. Louis Board of Aldermen formerly ended their previous session and began a new session the following day. The 2017-2018 session ended on Monday, the 2018-2019 session began on Tuesday. No legislation was introduced — expect quite a bit a week from today when regular 10am Friday meetings resume. As I’ve done in the past, new Board Bills will be listed the day they’re introduced.
Since a new session is starting, this is a good opportunity to review the how a board bill becomes an ordinance:
Workflow When it comes to passingBoard Bills, the Board of Aldermen agenda is broken down into four basic parts.
First Reading of Board Bills/Referenceto Committee
Second Reading of Board Bills
Perfection of Board Bills
Third Reading/Final Passage of Board Bills
Introduction of Board Bills Each Friday, Bills are introduced (first read) during the Board of Aldermen meeting. The meetings are held at 10 A.M. in Room 230. The President then assigns each bill to one of 15 committees.
Committee Hearings It is up to the chairman of each committee to schedule hearings to review any Bills that have been introduced and assigned.
During the committee hearing, an alderman will present a Bill to the committee members, discuss its merits and ask that it be sent to the full Board of Aldermen with a “do pass” recommendation. Sometimes, the committee will make changes to the Bill before sending it back to the floor. These changes are called Committee Substitutes or Amendments.
If a sponsor senses that a Bill lacks sufficient support, the sponsor may ask that it remain in committee while changes are drafted. Although rare, sometimes a Bill will remain in committee until the end of the session, at which time the Bill “dies.”
Second Reading Once a bill has been passed out of committee, it is then ready for Second Reading at the next Board of Aldermen meeting. There is no discussion of the bill during Second Reading – it’s simply read out loud.
Perfection The following week, the bill appears on the Perfection Calendar. This is when the sponsor may stand up and explain to the full Board what the Bill is and ask for support. On controversial Bills, there is often a long and lively debate. This is also the time to make any final changes to the Bill (Floor Substitute).
It takes a majority of the aldermen present to vote in favor of perfecting a bill and move to Final Passage. (All votes at the Board require a majority of the aldermen present except on Final Passage, which requires a total of 15 “yes” votes regardless of how many aldermen are present at the meeting. Bills regarding the sale of City-owned land require 20 “yes” votes.)
Third Reading/Final Passage One week after Perfection, the Bill will appear on Third Reading/Final Passage. No more changes can be made to a Bill at this point. Each alderman can either vote “yes” or “no.” It takes 15 “yes” votes to finally pass a Bill and send it to the Mayor’s desk.
There is a procedure by which a Bill can move more quickly through the process. After Second Reading or after Perfection an alderman may ask to suspend the rules and have the bill moved to the next section on the agenda during the same meeting.
Timeline First Reading = 1st week. Passed out of committee and Second Reading = 2nd week Perfection (suspend the rules and obtain Third Reading/Final Passage) = 3rd week The quickest a Bill can go from First Reading to Final Passage is three weeks at a minimum. It is not unusual, however, for the process to take longer. It could be several weeks before the Bill gets a committee hearing, which would slow down the process.
The sponsor may ask that a Bill be held in committee while changes are drafted, which will also slow down the process.
The best thing to do is to follow the weekly agenda. If the Bill you’re looking for does not appear on Second Reading, Perfection or Third Reading, then you know the sponsor must be holding it in committee for some reason or the Bill is still waiting for a hearing.
April 18, 2018Featured, Politics/PolicyComments Off on A Decade Since Developer Pyramid Construction Collapsed; Guidelines Needed for Development Incentives
A decade ago I was about four hours from St. Louis, still in a rehab hospital after my February 1st stroke. I got a call from a friend, a former Pyramid Construction employee, telling me he heard the heavily-leveraged company was shutting down that day. I immediately called someone still employed at Pyramid, but my call wasn’t returned. I ran the story Rumor: Pyramid Ceasing Operations based on my source.
Many people lost their jobs that day, some found out about their employer closing here. While unfortunate, I was just the messenger. Current & formers employees close to the matter felt is was important to get the word out as it was happening — hence the call to me.
From 2010:
For much of this decade, Steffen’s Pyramid Construction Inc. led the way in loft construction and other residential and commercial projects in downtown St. Louis. But overwhelming debts crushed the company, which went out of business in 2008. (Steffen indicted on bank fraud charge)
Q: Agree or disagree: The City of St. Louis should end all development incentives (tax increment financing, tax abatement, etc)
Strongly agree 1 [2.63%]
Agree 1 [2.63%]
Somewhat agree 4 [10.53%]
Neither agree or disagree 1 [2.63%]
Somewhat disagree 4 [10.53%]
Disagree 6 [15.79%]
Strongly disagree 21 [55.26%]
Unsure/No Answer 0 [0%]
Wisely a large majority disagreed. Incentives are necessary to produce desired results where the market hasn’t or can’t made the numbers work. What needs to stop is incentives being used in hot areas for high-end projects — the type market conditions would support. That said, incentives where the project is very urban with ground-level retail, underground parking, etc can make sense.
It appears last year’s efforts to create guidelines failed.
In the late 1990s, Larry Deutsch was finally allowed to raze the historic 4-story building at 1101 Locust St. that housed Miss Hullings Cafeteria for decades. After the demolition crew left, new sidewalks were poured and the lot was covered in asphalt for surface parking. That’s when the line dividing private from public property was moved more than 3 feet. Legally the lot is 121 feet x 102 feet 6 inches. But by narrowing the public sidewalk, they made their lot 124.33′ x 105.83′ — a gain of 6%! This is roughly 750 square feet of public space that has been used privately for years.
This allowed them to have 5 additional parking spaces. The current daily rate is often $10, but let’s say $5/day. With about 300 revenue days a year, that’s $7,500 in additional revenue per year. Over 18 years the total estimate is $135,000. Serious money made by taking from the public right-of-way.
After my May 2016 post they put orange cones in the parking spaces that were partially on public property.
Each time I’d go past the cones would be out — not as good as pouring new concrete sidewalks at the actual property line. But the other day I noticed they were back to stealing public right-of-way for their profits!
Ownership hasn’t changed. As I said two years ago, the city needs to force the Deutsch family to pour new concrete sidewalks that extend all the way to the property lin. They also need to bring this surface lot up to current standards for surface lots — with physical barriers between sidewalk & parking so cars can’t park on or drive on public sidewalks.
AARP Livibility Index
The Livability Index scores neighborhoods and communities across the U.S. for the services and amenities that impact your life the most
Built St. Louis
historic architecture of St. Louis, Missouri – mourning the losses, celebrating the survivors.
Geo St. Louis
a guide to geospatial data about the City of St. Louis