Celebrating Blog’s 19th Anniversary

 

  Nineteen year ago I started this blog as a distraction from my father’s heart attack and slow recovery. It was late 2004 and social media & video streaming apps didn’t exist yet — or at least not widely available to the general public. Blogs were the newest means of …

Thoughts on NGA West’s Upcoming $10 Million Dollar Landscaping Project

 

  The new NGA West campus , Jefferson & Cass, has been under construction for a few years now. Next NGA West is a large-scale construction project that will build a new facility for the National Geospatial-Intelligence Agency in St. Louis, Missouri.This $1.7B project is managed by the U.S. Army …

Four Recent Books From Island Press

 

  Book publisher Island Press always impresses me with thoughtful new books written by people working to solve current problems — the subjects are important ones for urbanists and policy makers to be familiar and actively discussing. These four books are presented in the order I received them. ‘Justice and …

New Siteman Cancer Center, Update on my Cancer

 

  This post is about two indirectly related topics: the new Siteman Cancer Center building under construction on the Washington University School of Medicine/BJC campus and an update on my stage 4 kidney cancer. Let’s deal with the latter first. You may have noticed I’ve not posted in three months, …

Recent Articles:

Asphalt Roadway Damaged at MetroBus Stops

 

City buses are great ways to transport many people, but their weight can take a toll on roads.  Bus stops, in particular, take a lot of punishment. This #11 stop on Chippewa at Hampton is a good example:

Repeated weight of buses stopping on Chippewa just east of Hampton has messed up the paving.
Repeated weight of buses stopping on Chippewa just east of Hampton has messed up the paving.

Asphalt tends to move when it is hot and pressure is applied over and over. To avoid such a maintenance headache some cities & transit agencies are paving bus stops in concrete.

Source: Washington Metropolitan Area Transit Authority Guidelines for the Design and Placement of Transit Stops, click image for PDF
Example of concrete paving at a bus stop. Source: Washington Metropolitan Area Transit Authority Guidelines for the Design and Placement of Transit Stops, click image for PDF

These concrete bus stops aren’t cheap though, and with hundreds of heavily used bus stops the cost to upgrade all would be astronomical.

I’ve observed damage like this at numerous other bus stops. I’m not sure how much this costs the city to repair, or if remains until the road is resurfaced. Thoughts?

— Steve Patterson

Readers: No Clear Favorite For License Collector

August 7, 2013 Politics/Policy 5 Comments
 

Governor Nixon must now appoint someone to fill the county-level position of License Collector, vacated by Michael McMillan who has started a new position as president of the Urban League of Metropolitan St. Louis, see Poll: Who Should Gov Nixon Appoint St. Louis License Collector? for the introduction of last week’s poll. Here are the results:

Q: Who should Missouri Gov Nixon appoint as St. Louis License Collector to finish Michael McMillan’s current term?

  1. Brian Wahby 16 [17.2%]
  2. Terry Kennedy 16 [17.2%]
  3. Phyllis Young 15 [16.13%]
  4. Fred Wessles 9 [9.68%]
  5. Nobody listed here 8 [8.6%]
  6. Other: 7 [7.53%]
  7. Martin Casas 6 [6.45%]
  8. Jeffrey Boyd 5 [5.38%]
  9. Unsure/No Answer 5 [5.38%]
  10. Donna Baringer 4 [4.3%]
  11. Marlene Davis 2 [2.15%]

Nobody jumped to the front of the class, Wahby & Kennedy tied with Young just one vote behind. Readers provided 7 other answers:

  1. Steve Patterson
  2. no-one combine with collect of rev
  3. State Representative Josh Peters
  4. May
  5. Darius Chapman
  6. Dave Drebes
  7. Steve Patterson

Let’s go through the above list:

  1. I’m not sure if the two that put my name in were serious, or not. I’m flattered but I’d be a horrible license collector.
  2. In the comments on the original piece there were suggestions on doing away with the position, more on that below.
  3. I haven’t met Josh Peters but he was elected in April to finish the unexpired term of the 76th Missouri house district.
  4. May is in reference to Karla May, daughter of St. Louis Registrar Parrie May. More below.
  5. Darius Chapman works in the License Collector office as manager of Field Operations & Manufacturing Departments, see award
  6. Dave Drebes describes himself on his Twitter profile (@MissouriScout) as a “political observer.”

The separate elected positions of license collector and collector of revenue could be combined. One person interested in the job wants to eliminate the position:

“I would like to eliminate the elected position,” Sixteenth ward Alderwoman Donna Baringer

Baringer wants to be the new city license collector and then immediately put herself out of a job. (KMOV)

I think we need to reconsider every elected office, city department, etc in city government.

The St. Louis American had a different look at who Nixon might select:

Karla May – the new African-American consensus pick to succeed Michael McMillan as St. Louis license collector – comes highly recommended by her colleagues, past and present, in the Missouri House of Representatives. (Source – recommended)

I don’t have a favorite, but I do favor reducing the number of elected offices.

— Steve Patterson

Accessing Metro’s Transit Access Center Not Straightforward

 

Seniors (65+) and the disabled can ride Metro for half price, but a reduced fare permit is required. Seniors have several options on obtaining such a permit, the MetroRide store downtown, for example. The disabled, like myself, must visit Metro’s Transit Access Center at 317 DeBaliviere. Let’s pretend we’re newly disabled and need to get a reduced-fare permit, for the first time. We arrive on the #90 (Hampton) MetroBus or via MetroLink at the Forest Park station.  Remember this station opened twenty years ago, and was altered significantly in 2006 when the extension to Shrewsbury was built.

We get off the bus or come up from the platform on the east side of DeBaliviere and head north to find our destination.

Based on the map online the Transit Access Center must be located in the strip mall over there.
Based on the map online the Transit Access Center must be located in the strip mall over there.

The curb ramp has nothing to do with the crosswalk, no curb ramp exists on the other end of the crosswalk. When the light turns green I'll have to head over to the auto drive where cars will be leaving.
This curb ramp has nothing to do with the crosswalk, no curb ramp exists on the other end of the crosswalk. When the light turns green we’ll have to head over to the auto drive where cars will be leaving.

Made it across safely, there's our destination
Made it across safely, there’s our destination

Drat, no ramps on either side of the driveway! We could enter the auto driveway and hope we find a ramp before a vehicle backs over us,  but none are visible from this point. Let’s continue along the public sidewalk to see if we can find another way in or our destination.

There's a ramp, but we can't reach it from here, We could go back and risk getting backed over or continue.
There’s a ramp to the right of that car, we can’t reach it from here due to planter/curb/parking, We could go back and risk getting backed over or continue until we see our destination. I say we keep looking for a safe route.

Oh, there's the Transit Access Center, there must be a pedestrian route down further.
Oh, there’s the Transit Access Center, there must be a pedestrian route down further.

See, I knew we'd find a direct way! Oh wait...
See, I knew we’d find a direct way! Oh wait…

Naturally a curb is in our way
Naturally a curb is in our way

All the way on the far end is a route to reach the storefronts from the public sidewalk.
All the way on the far end is a route to reach the storefronts from the public sidewalk.

We get to the door and we're glad it has an automatic opener, but it doesn't work when pressed. "It's never worked", says the person inside when we mention it.
We get to the door and we’re glad it has an automatic opener, but it doesn’t work when pressed. “It’s never worked”, says the person inside when we mention it.

Leaving we see the problems from the other side
Leaving we see the problems from the other side

Still too risky to go behind parked cars
Still too risky to go behind parked cars, why must it be such a challenge?

caption
The fix here in this privstely-owned development is pretty simple actually, just replace a couple of curbs with ramps.

I’m not sure how long the Transit Access Center has been a tenant in this building, at least 4 years. The building was built in 1988, two years before the ADA and five years before the MetroLink opened. But for the last twenty years this development adjacent to a light rail station hasn’t been very accessible.

Again, this is the location every disabled person that seeks a reduced-fare permit must go. Granted, access from disabled parking is easy enough but many who need the permits can’t drive. For the disabled, independence is very important.

 — Steve Patterson

City Planning Student Critique of Proposed St. Louis Streetcar

 

Regular readers know I’m a supporter of public transit, and an advocate for modern streetcars, in particular. When I received an email from a planning student asking about publishing her paper on her evaluation, I was curious. Here’s how Jill Mead described herself to me in that email:

I’m a Masters in Public Health and Masters of City Planning student at the University of North Carolina in Chapel Hill. I also work for the Pedestrian & Bike Info Center at UNC’s Highway Safety Research Center. If that weren’t enough, I’m very much a St. Louisan. I grew up in Forest Park Southeast (in the 80s!) and am a K-12 graduate of the SLPS. I went to UMSL for one year and Wash U for the rest of my college degree. 

Though I don’t agree with her analysis and conclusions in the paper, I thought it would spur some good discussion. Here is a brief summary of her paper:

Artist rendering of proposed streetcar in downtown St. Louis
Artist rendering of proposed streetcar in downtown St. Louis.

Spurred by the availability of federal funds and inspired by the success of streetcar projects in other cities, the non-profit Partnership for Downtown St. Louis released a feasibility study for a downtown St. Louis streetcar project in March 2013. The feasibility study recommended the project based on its likelihood of achieving its two main objectives: (1) enhancing the region’s transit system and (2) catalyzing economic growth throughout the streetcar corridor. While the St. Louis Streetcar Feasibility Study is optimistic about the achievement of these two objectives, reviewing the study calls some of their claims into question. Ridership estimates seem inflated given the slow travel speeds of the streetcar and methodology used. The choice of alignment fails to prioritize the city’s densest areas and is out of sync with plans being made at the regional level. In terms of the streetcar’s ability to catalyze economic development in St. Louis, the study inadequately addresses the wide variety of contextual factors, such as land use policy and the existence of strong public-private partnerships and market demand that were characteristic of other cities’ success in attracting development to streetcar corridors. The paper concludes that strategies to improve economic growth and public transportation are necessary in St. Louis, but it is not clear that the proposed St. Louis Streetcar project is the best use of public resources to achieve these goals.

Here’s a link to Mead’s full paper: Evaluation of the St. Louis Streetcar Proposal (19 page PDF).

Mead must have missed the reason for looking at a modern streetcar now, mentioned on page 2 of the Final St. Louis Streetcar Feasibility Study:

When St. Louis University announced plans to move their law school from midtown St. Louis to downtown, the Partnership for Downtown St. Louis once again began the discussion of a streetcar for downtown. This move presented an opportunity to link the two campuses with a streetcar and fulfill the goals of the Downtown Next Plan.

The idea of SLU running shuttle buses every day between midtown and downtown meant only a small segment of the population would be served, pollution would increase, roads would be see additional traffic from the continuous loop of shuttles. Us regular transit riders along Olive/Lindell would still have 30-40 minute headways on the existing #10 MetroBus.  Why not improve the public transit system for all?

Connecting to south St. Louis wouldn’t help SLU with transporting students, faculty, and staff between the main campus in midtown and the new law school building downtown. By including a north-south segment on 14th the proposal recognizes future expansion into south & north city.

The existing MetroBus isn’t slow, it doesn’t take me long to get to the Central West End from my downtown loft, but the streetcar will come every 10-15 minutes instead of every 30-40 minutes — that’s far more important than whether it takes 8 minutes versus say 12-15 minutes to reach my stop! The streetcar will be faster than the bus, the center dedicated right-of-way, off-board fare payment, etc. will  make the trip no longer than bus, very likely shorter. Buses are sometimes late; they get stuck in traffic, wheelchair lifts malfunction, rerouted around events, etc. When the bus takes 10 minutes to get to my stop but arrives 10 minutes late that puts me way behind. If I take the 30 minute earlier bus I arrive way too early and it uses more of my day.

Also from page 2 of the final study:

The purpose of the study was to: 

  • support the goals established in The Downtown Next 2020 Vision to improve Downtown’s accessibility; 
  • create a catalyst for continued economic development; 
  • provide additional opportunities for alternative transportation; 
  • support the region’s and City’s sustainability initiatives;
  • and  promote an environment that will retain and attract new jobs and residents to the City.

I’ve invited Mead to come downtown and ride the #10 MetroBus with me, to midtown and back, to better understand the existing conditions, then I think she’ll see how the streetcar will be a potentially massive improvement. She’s in town visiting family, we’re talking about doing this later in the week.

Mead is correct when she said, “the study inadequately addresses the wide variety of contextual factors, such as land use policy.” The word  “zoning” appears just four times in the final study report. “Proper zoning” is mentioned, but not defined. My fear is we won’t set up the necessary land-use controls to guide new development over the 10-20 years following the completion of the streetcar. If the prevailing Laissez faire attitude in St. Louis is allowed to squash good form-based zoning then the streetcar investment will be at least partially wasted.

But if we can get the formula right, it will be a boon and expansions can follow every few years, as we’ve seen in other cities. But I’ve been here long enough to know the old guard isn’t going to change so easily. Will this time be different?

Please share your thoughts on Mead’s paper, or my response, below.

— Steve Patterson

Poll: What Three (3) St. Louis Area Restaurants Have Closed That You Wish Were Still Open?

 

Many restaurants I remember from my childhood in Oklahoma City have since closed: Split-T, Al’s Hideaway BBQ, Nicolosi’s, etc. In my 23 years in St. Louis I’ve seen many restaurants come and go too. All I have left are fond memories.

Please vote in the poll, located in the right sidebar
Please vote in the poll, located in the right sidebar

The poll this week asks: What three (3) St. Louis area restaurants have closed that you wish were still open? So put on your nostalgia hat and review the list of 30 I’ve included as options in the poll:

  1. 94th Aerosquadron
  2. Bleeding Deacon
  3. Brandt’s
  4. Busch’s Grove
  5. Chez Leon
  6. Chuy Arzola’s (Dogtown)
  7. Del Taco
  8. Delmar Lounge
  9. Duff’s
  10. El Burrito Loco
  11. Empire Sandwich Shop
  12. Flaco’s Tacos
  13. King Louie’s
  14. Marty’s Baking
  15. Minions Cafe
  16. Miss Hullings
  17. Monarch
  18. O’Malley’s
  19. Papa Fabare’s
  20. Parkmoor
  21. Pestalozzi Place
  22. Red Moon
  23. Rossino’s
  24. Sunshine Inn
  25. The Salad Bowl
  26. Shangri La Diner
  27. The Stable
  28. Tangerine
  29. Tin Can
  30. Zoe’s Panasian

They’re alphabetical here but will be presented in random order in the poll (right sidebar). Here are more closed restaurants you might want to include in the other field:

  1. Colorado
  2. Gulf Coast Cafe
  3. Kitchen K
  4. Kopperman’s
  5. La Fourchette
  6. Mattingly’s
  7. Mojo Tapas
  8. Moxy
  9. Pelican
  10. Sage
  11. Simply Fondue
  12. Shuggas
  13. Southern Belle Supper Club
  14. Tanner B’s
  15. Terrene

You can also review a list of closed restaurants on UrbanSpoon.com.

Thanks to my Facebook friends with help generating all these names, I’d forgotten about many. Please share your memories in the comments below.

— Steve Patterson

Advertisement



[custom-facebook-feed]

Archives

Categories

Advertisement


Subscribe